Find information on vaccinations, testing, guidance for residents and businesses, frequently asked questions, and more.
The City and Mile High Flood District are moving forward with an engineering design and construction project to upgrade the existing levee and flood control system along the west bank of the South Platte River called the Globeville Levee Improvements. The Improvements will extend from about 31st Street to Franklin Street and will be broken into phases for design and construction. The improvements generally include raising the existing earthen embankment levee and floodwalls one to three feet to meet FEMA requirements for certification of 44 CFR 65.10.
Globeville Levee Project Study Area (Full Size PDF)(PDF, 15MB)
Phase 1 - Construction WQ - Heron Pond Project Phase 2 - Design This project is currently in the design phase, which is expected to continue through 2021. Construction dates will be determined following the final design.
Kelly Crum, P.E., Engineer Department of Transportation and Infrastructure Kelly.Crum@denvergov.org WQ - Heron Pond Project