2026 Project Archive

See highlights from projects completed by Department of Transportation and Infrastructure (DOTI) in 2026.

Alameda Ave Underpass Rehabilitation

Project Overview

The W Alameda Ave Underpass pedestrian pathway between Cherokee St and S Santa Fe Drive provides a vital mobility link for Denver residents to retail stores, light rail, recreational and commercial destinations on each side of the railroad corridor. The site presented several functional and experiential deficiencies in the concrete retaining walls that DOTI identified for improvements in the 2019 Connect Alameda Feasibility Study. Foremost among these issues is the narrow width of the pedestrian/cyclist pathway, the noise and proximity of passing vehicles, and the condition of the existing retaining walls, which exhibit crumbling, cracking, and spalling concrete from overhead that presents safety hazards to both adjacent vehicular and pedestrian traffic.

Ultimate Improvements

The ultimate improvements require reconstruction of the retaining walls and replacement of the railroad bridge structures to widen the corridor, which is part of the city's long-term planning.

Interim Improvements

Until the ultimate improvements can take place, the intermit solution addressed safety hazards and improve the visual and contextual experience for all users. The project, funded by the 2017 voter-approved Elevate Denver GO Bond, which allocated $7 million for the project, stabilized the structure and make ADA improvements. The project included a new grade-separated, ADA-compliant sidewalk/multiuse path along the north side of Alameda. The project also stabilized deteriorating wall sections.


Project Map

Alameda Underpass Rehabilitation Project Map on W Alameda Ave between S Santa Fe Dr and S Cherokee St

 

Broadway & I-25 Travel and Safety Improvements

Project Summary

DOTI has made travel and safety improvements at Broadway & I-25 that include replacing the existing at-grade southbound on-ramp to I-25 from Broadway with an elevated ramp to ease vehicle congestion and enhance safety. Other work improved access to the I-25 & Broadway Station for people who walk and bike.

Infographic listing community outreach, daily use, construction upgrades and media mentions for project

 


Completed Milestones

  • Opened new elevated on-ramp to southbound I-25 from Broadway.
  • Extended Bannock Road south of Exposition Avenue, providing access to the RTD Park-n-Ride from the north. This includes: improved lighting, landscaping and a new multi-use pathway. 
  • Completed sanitary sewer and storm sewer work throughout the area.
  • Constructed a major portion of the elevated on-ramp to southbound I-25 , including two new bridges.
  • Constructed a temporary parking lot, W. Exposition from Broadway to Bannock and elevated I-25 on-ramp across Broadway.
  • Reconstructed E. Exposition from Broadway to Lincoln and installed new traffic signals at both intersections.
  • Reconstructed east sidewalk between Ohio and Kentucky.
  • Reconstruct Kentucky Avenue, combining the existing intersection with the elevated southbound on-ramp to I-25.
  • Install new traffic signals at Ohio Avenue (between Broadway and Lincoln Street) and at Broadway and Kentucky Avenue.
  • Reconstruct local streets including Lincoln, Broadway, Kentucky and Ohio
  • Connect the Broadway bike lane to the RTD Broadway station.
  • Extend bikeway from Center to Exposition.
  • Expand multi-use pathways for pedestrians and cyclists.

By Spring 2026, this project will:

The I-25 & Broadway Station is the second busiest in the RTD system and supports a high frequency of bus travel along the Broadway corridor, connecting Englewood to downtown Denver.

Striping has been added to the northbound I-25 off-ramp lanes with access to Lincoln, Ohio and Broadway. Image taken facing east on northbound I-25 off-ramp, south of Ohio.

 Striping has been added to the northbound I - 25 off - ramp lanes with access to Lincoln, Ohio and Broadway. Image taken facing east on northbound I - 25 off - ramp, south of Ohio

Crews finalize installing signage ahead of traffic signals and pedestrian indicators being turned on. Image taken facing northeast at northbound Broadway at Ohio intersection.

Crews finalize installing signage ahead of traffic signals and pedestrian indicators being turned on. Image taken facing northeast at northbound Broadway at Ohio intersection

Striping has been added to the RTD parking lot beneath the I-25 viaduct. Image taken facing northwest under the I-25 viaduct, west of Broadway.

Striping has been added to the RTD parking lot beneath the I - 25 viaduct. Image taken facing northwest under the I - 25 viaduct, west of Broadway

A raised pedestrian crossing has been added to increase safety of pedestrians traveling on Ohio. Image taken facing north from the right lane of the northbound I-25 off-ramp at Ohio.

Raised pedestrian crossing has been added to increase safety of pedestrians traveling on Ohio. Image taken facing north from the right lane of the northbound I - 25 off - ramp at Ohio

Progress continues to be made at the Denver Tramway Trolley Line interpretative mitigation area. Image taken facing east from the sidewalk east of Bannock and north of the I-25 on-ramp

Progress continues to be made at the Denver Tramway Trolley Line interpretative mitigation area. Image taken facing east from the sidewalk east of Bannock and north of the I - 25 on - ramp


Project Map

Map of Travel and Safety Improvements

 

Bronco & 19th Street Pedestrian Bridge Rehabs and Guardrail Repairs

The Denver Department of Transportation and Infrastructure, in collaboration with Concrete Express Inc. has completed bridge rehabilitation work on the Bronco Pedestrian Bridge over the Platte River . Work included removal and replacement of expansion joints, concrete deck repairs, minor concrete repairs, bollard installation, and bridge painting.

Also completed, 19th Street Pedestrian Bridge rehabilitation work and guardrail repairs. This work included bridge joint replacement, concrete deck repairs, concrete pavement repairs, deck drain replacement, pedestrian railing repairs, bollards, removal of the timber walkway, spot painting, and an anchorage system under the bridge.

Bowles Ditch Storm Improvements

Olsson was retained by Mile High Flood District (MHFD) and the City and County of Denver to provide design of storm drain system improvements in the Marston Lake North Drainageway. The main objectives of the project are to separate stormwater flows from the Bowles Lateral, improve drainage and alleviate high ground water near the properties adjacent to the Bowles Lateral at Saratoga Place, and improve the overall drainage and reduce street flow through the project area.

The general design concept is to install new storm drain infrastructure to collect and convey 100-year flows from West Wagon Trail and South Field Way to the existing storm drain system downstream of the Glenbrook Pond. Storm flows will be separated from the Bowles Lateral with the improvements. The project will be completed in two phases.

Phase I construction began in December 2022 and was completed on June 30, 2023.

Phase I consisted of improvements from the Glenbrook Pond outfall to just upstream of the Bowles Lateral. Storm drain lines, inlets, and manholes were installed in West Garrison Street and South Garland Street, then across the Bowles Lateral to West Saratoga Place. As part of the project Bowles Lateral was put into a 60-inch pipe. A headwall and wingwalls were constructed at the culvert entrance. An 8-inch French drain was installed along the new Bowles Lateral pipe in the vicinity of the ditch to collect groundwater. Curb Ramps were replaced at the intersections of South Garrison Street and South Holland Way, South Garland Street and West Garrison Street, and West Saratoga Place and where Wagon Creek Trail crosses West Saratoga Place. On West Garland Street, curb, gutter, and sidewalk were be replaced.

Construction for Phase II began in Spring 2025, and will last approximately 5 months.

Phase II includes installing improvements upstream of the Bowles Lateral, and at Hoyt Street and West Saratoga Place. Phase II includes installing 36- and 42-inch storm drain trunk line with laterals and inlets along West Saratoga Place, West Wagon Trail Drive, and South Field Way. The existing storm drain system in South Field Way will be connected to the new system at the intersection of South Field Way and West Wagon Trail Drive. Construction will also include curb ramps, curb, gutter, and sidewalk replacement. Additionally, inlets, laterals, and storm drain trunk line will be installed, conveying storm flows to the existing system in Hoyt Street, ultimately conveying flows to the Glenbrook Pond.

Central Street Promenade Elevate Denver Bond Project

The proposed enhanced the streetscape along the eastern side of Central Street, spanning from 15th Street to 19th Street. More specifically, the designated project corridor for this work encompassed the landscape areas situated along this section of Central Street, extending from the rear of the sidewalk to the retaining wall owned by the Colorado Department of Transportation (CDOT). The enhancements include various landscape elements and the establishment of a dog park, all of which will be managed by Denver Parks & Recreation.

  • Landscaping improvements from 15th Street to 19th Street
  • Dog Run - Large and Small Dog Areas
  • 2 Shade Shelters in Dog Run

S. Dahlia Street Bridge Replacement

The existing bridge on S. Dahlia Street was replaced. DOTI removed the deteriorating bridge, which was constructed in 1952, and installed a large concrete box culvert as part of the Bridge Asset Management Program. The road over the new box culvert matches the existing configuration of one lane in each direction with sidewalks on both sides.

Denver Moves: Cherry Creek

Denver Moves: Cherry Creek (DMCC)(PDF, 20MB) is a cohesive strategy for the development of future transportation infrastructure and programs that will support the City's mobility goals in the Cherry Creek neighborhood and surrounding area. The Denver Moves: Cherry Creek plan aims to create a safer and more convenient environment to walk, bicycle, take transit, deliver goods, and drive in and around Cherry Creek as the area continues to grow. DMCC will guide how the City of Denver programs, funds, plans, designs, builds, and maintains the future multimodal transportation network in the area. The plan appendices are available here(PDF, 21MB).

The Plan includes recommendations developed through an inclusive and collaborative process. Community members, including area neighborhood organizations, local employers and business organizations, employees and commuters, local schools, health care providers, non-profit organizations, advocacy groups, and City Council members and staff, provided feedback on the plan's process, outcomes, and individual projects. Throughout the process, DOTI incorporated community feedback into the study analysis, engagement strategy, and final report. A summary of how DOTI responded to community feedback is available here(PDF, 279KB).

East 8th Avenue Signal Replacement

Project Overview

The Denver Department of Transportation and Infrastructure (DOTI), in collaboration with Flatiron Dragados Constructors, made travel and safety improvements at eight intersections along East 8th Avenue at: Grant Street, Logan Street, Washington Street, Clarkson Street, Corona Street, Downing Street, York Street and Josephine Street.

Intersection upgrades included:

  • replacing the old style, span wire traffic signals with metal mast arm assemblies and larger signal heads placed over every travel lane to increase visibility
  • updating pedestrian crossings
  • adding ADA ramps
  • pouring new concrete curbs and gutters
  • installing new lane striping and signage
  • updating stormwater drainage

Evans Avenue Corridor Study

Denver’s Department of Transportation and Infrastructure (DOTI) studied the East Evans Avenue corridor from S. Colorado Boulevard to S. Quebec Street. DOTI evaluated all forms of transportation including walking, bicycling, rolling, transit, motor vehicles, and freight, as well as parking utilization, opportunities for green infrastructure, access management, and right of way and utility impacts.

The Evans Avenue Corridor Study builds upon Denver Community Planning and Development’s (CPD) Near Southeast Neighborhood Planning Initiative (NPI). Now complete, the corridor plan will be the guiding document for the future of mobility on the Evans Avenue Corridor.

 

Evans Avenue Vision Zero Safety Projects

Evans Avenue serves as a critical east/west corridor through the Denver metropolitan area and is home to a diverse community of residents and businesses that are deeply invested in their neighborhoods. The corridor has historically experienced crashes impacting drivers, cyclists and pedestrians, and the City and County of Denver is working to improve safety. This project from Clay Street to Osage Street, aimed to enhance the community’s connectivity, accessibility, and safety for drivers, pedestrians, and bicyclists. 

The Evans Avenue Vision Zero Project is a part of the Safer Main Streets (SMS) Initiative funded through federal grants administered by the Colorado Department of Transportation (CDOT). The project included the design and construction of safety improvements such as raised medians and pedestrian refuges. These improvements will reduce speeds, shorten pedestrian crossings, add ADA compliant curb ramps, and eliminate some left-turn movements. 

  • Addition of 5 raised medians located between Clay Street and Bryant Street, Bryant Street and Zuni Street, Zuni Street and Vallejo Street, Vallejo Street and Tejon Street, and Pecos Street and Osage Street. 

  • Pedestrian Improvements at Bryant Street and Pecos Street 

  • Left-turn restrictions at Bryant Street and Pecos Street 

Green Valley Ranch Boulevard Travel Improvements

Denver's Department of Transportation & Infrastructure and prime contractor, Graham, Ltd., have completed the Green Valley Ranch Boulevard Travel Improvements Phase 2 & 3 project. The project's purpose was to increase safety, mobility and accessibility along this vibrant urban corridor in northeast Denver.  

Learn More more about the Green Valley Ranch Blvd Travel Improvements Project

 

Hampden Avenue

The Hampden Avenue corridor is a critical east-west arterial near the southern limits of the City and County of Denver serving residents, visitors, shoppers, and employers. The vision for Hampden Avenue is a safe and engaging multimodal street that provides intuitive connections to residents and businesses to services and destinations, while balancing the regional needs as a vital east/west corridor in southeast Denver

Locust Street Intersection Improvements

  • Raised concrete medians on Hampden Ave with pedestrian refuge and signal push buttons
  • Raised concrete bulbout
  • Left turn signal phasing improvements
  • Signing and pavement marking improvements

Southmoor Monument Sign Installation

  • Signing and pavement marking improvements

Dayton Street Intersection Improvements

  • Raised concrete median on Hampden Ave with pedestrian refuge and signal push buttons
  • Shortening of Dayton island to widen crosswalk
  • Signing and pavement marking improvements

Florence Street to Girard Improvements

  • Raised concrete median from Florence St to E Girard Ave that includes a pedestrian refuge and signal push buttons
  • Installation of inlets and storm pipes in the raised median
  • Improved barriers, signage, pavement markings and bus stops

I-25 Ramp Crosswalk Improvements

  • Installation of enhanced crosswalk warning devices (Rectangular Rapid Flashing Beacons), enhanced pavement markings and signage at all four channelized right turns at the I-25 Ramps/Hampden Interchange

Bus Stop Enhancements

  • Concrete boarding areas, created space for future shelters, benches, trash cans

Hazel Court and Iowa Avenue Improvements

The City and County of Denver’s Department of Transportation and Infrastructure (DOTI) designed and engineered this project to eliminate gaps in sidewalks, improve drainage, and improve street infrastructure in the Mar Lee neighborhood. This project is part of a larger effort by the city to improve pedestrian safety and mobility

High Line Canal Underpasses

Yale Roadway Improvements at Holly 

E. Yale Avenue is a critical east-west arterial in southeast Denver, crossing through and serving City and County of Denver (CCD) and Arapahoe County residents. The High Line Canal trail serves as a major regional trail facility for both recreation and commuting, spanning from southwest to northeast Denver. The trail now crosses underneath Yale Avenue just west of the S. Holly Street intersection, providing a safer and more convenient travel option. Construction of the underpass was completed in October 2026. 

Read more about Yale Roadway Improvements at Holly


Mississippi/Parker — Status: Completed

Denver’s Department of Transportation and Infrastructure, or DOTI, has created a safer, more convenient connection for people who walk and ride bikes on the High Line Canal Trail. Crews have installed an underpass beneath Parker Road to continuously connect the High Line Canal Trail and allow people walking and riding bikes to have a safer crossing at Mississippi Avenue. Previously, trail users cross at street level amid heavy vehicle traffic. This project was completed in December 2023.

Colorado/Hampden — Status: Completed

This project provided a continuous multi-use trail bypassing the busy intersection of Hampden Avenue and Colorado Boulevard by building two underpasses beneath these two major arterials. Final designs were completed in 2019.  Construction began in May 2020 and two underpasses at Colorado and Hampden opened to the public in June 2021.

See project maps, features, and renderings

Monaco Parkway over Cherry Creek Bridge Replacement

TBridge replacement and rehabilitation project on Monaco Parkway over Cherry Creek . This project removed the 60-year-old bridge over Cherry Creek and replaced it with a new bridge structure, tieing-in both directions of Cherry Creek Drive, and repaved Cherry Creek Trail and widened sidewalks over the bridge.

DOTI invested approximately $12.7M in the bridge replacement project with funding approved by voters as part of the Elevate Denver Bond.

West 38th Avenue Corridor Study

Denver’s Department of Transportation and Infrastructure (DOTI) has completed the West 38th Avenue Corridor Study.  The long-term vision for the corridor recommends a reduction in the number of travels lanes in order to create more space to widen sidewalks, add space for street amenities and landscaping, maintain some on-street parking, and incorporate transit priority treatments. The study also recommends near and mid-term safety improvements at key intersections on the corridor.

West 38th Avenue was identified as a corridor in need of investment through various previous projects, each with its own community outreach and outcomes. The corridor study began by analyzing the feasibility and compatibility of these previous recommendations and current community needs. The study recommendations create a cohesive plan for the entire corridor that will guide future capital improvement projects and adjacent development.

 

16th Street Mall Project

The 16th Street Mall Improvement Project created a safe, welcoming space for everyone in the heart of downtown. In addition to improving aging infrastructure, the mall project now offers opportunities to improve the experience of everyone who visits the mall.

See history of the completed project.

16th Street Improvement Project Audit Response(PDF, 456KB)

16th Avenue Storm Interceptor

The East 16th Avenue Storm Interceptor project area is located in Montclair Basin, to address flooding of the neighborhood. Existing storm sewers in East 16th Avenue and Batavia Place are currently undersized; this project's goal is to work with hydrology developed by the Outfall Systems Plan (OSP) team to size, design, and construct a new storm main line to safely transport the flows from existing systems in Colfax Avenue and East 16th Avenue towards City Park, while picking up the local flows along the way. Phase 1 construction completed in September 2022. Phase 2 construction was completed in 2026. 

Read more about the 16th Avenue Storm Interceptor here.

West Colfax Pedestrian Safety and Transit Improvements

The West Colfax Pedestrian Safety and Transit Improvements Project constructed roadway modifications between Sheridan and Irving Streets to improve the overall safety of the corridor for pedestrians. Additionally, the project constructed improvements that benefit the speed and reliability of transit service on the corridor. 

West Colfax Avenue was identified as a part of the high-injury network in the Vision Zero Action Plan. The high-injury network contains corridors with the highest percentage or serious injuries or fatal crashes. The pedestrian safety improvements were aimed to reduce crashes on the corridor and improve safety.

In 2017, Denver voters approved of funds in the Elevate Denver Bond to be used for pedestrian crossing improvements to West Colfax, as well as improving the efficiency and reliability of transit along the corridor. Transit improvements may include modifications to traffic signals and bus stops to support transit operations. Examples of pedestrian crossing improvements could include medians, curb extensions, and enhanced crossings that improve safety at intersections.

Read more about the West Colfax Improvements