Transportation Safety

Explore District 5's transportation and traffic safety efforts, including neighborhood traffic studies, the development of the 7th Avenue bikeway, and tools like slowdown signage to help calm traffic and improve safety.

Traffic Studies

6th Avenue

Our office sponsored and funded a traffic study of 6th Ave. Between Colorado Blvd. and Quebec St. to identify problems and come up with solutions that the Department of Transportation and Infrastructure (DOTI) can implement to alleviate traffic problems on that road and to improve crossings for people walking and biking.

Watch our January 25, 2022 community meeting with DOTI and Fehr and Peers and the slide deck can be viewed here.(PDF, 683KB)

Watch our June 28, 2022 community meeting with DOTI and Fehr and Peers and the slide deck can be viewed here.(PDF, 5MB)

Watch our August 30, 2022 traffic recommendations community meeting with DOTI and Fehr and Peers and the slide deck can be viewed here.(PDF, 2MB)

Our office and Fehr and Peers put together a complete memorandum(PDF, 204KB) and a simplified one-pager(PDF, 638KB) on the proposed changes.

If you'd like to take a deeper dive, feel free to peruse the collected traffic counts(PDF, 3MB) and the cost estimates(PDF, 568KB) as well. 

Our office is now working with DOTI to fund and implement these changes and improve traffic along 6th Avenue.

Lets make 6th Avenue safer graphic

8th Avenue

Our office sponsored and funded a traffic study of 8th Ave from Colorado to Quebec to identify problems and come up with solutions that the Department of Transportation and Infrastructure (DOTI) can implement to alleviate traffic problems on that road. 

Watch our community meeting with DOTI, Fehr and Peers, and DPD.

We also held two more meetings, one on Oct 19, 2021 to discuss the results of the study (the slide deck can be viewed here(PDF, 422KB)) and one on Nov 16, 2021 to talk about the recommendations moving forward (the slide deck can be viewed here(PDF, 1MB)).

Our office and Fehr and Peers put together a complete memorandum(PDF, 254KB) on the proposed changes as well as a simplified one pager(PDF, 671KB). You can review both by following the links above.

If you'd like to take a deeper dive, feel free to peruse the collected traffic counts(PDF, 623KB) and the signal warrants(PDF, 55KB) as well.

Our office is now working with DOTI to fund and implement these changes and improve traffic along 8th Ave!

8th AVE.png

13th and 14th Avenues

From July 2019 to December 2022, there were 851 calls for service on 13th and 14th Avenues due to car accidents. 107 of those involved accidents resulted in property damage, injury, or death. The District 5 Council Office has worked with the Denver Police Department and the Denver Department of Transportation and Infrastructure to address this community safety issue. There are recommendations in place to construct traffic calming measures along 13th and 14th, but they have not yet been installed. On March 15th, we hosted a community safety meeting with DPD and DOTI. 

In the Summer of 2023 DOTI did an assessment of the one way signage, and they will be adding needed signage in all locations along the corridor in the coming months.

10.16.23 DOTI wants to provide an update regarding the 13th/14th Study:

  1. Worked with DPD to ensure that speed monitoring and citations are being issued along the corridors. A table of that data is attached below. Additionally, will continue to coordinate with DPD on deployment of speed trailers and automated speed enforcement.
  2. Met with the East Colfax Neighborhood Association and discussed safety improvement strategies.
  3. Identified sidewalk gaps in East Colfax neighborhood to be constructed by RISE bond funding.Filling the gaps along E 13th and 14th Ave in the East Colfax neighborhood (between Quebec and Yosemite) is the highest priority, as are the north-south gaps that connect that neighborhood to future Colfax BRT stops. DOTI is aiming to put these projects out to design bid within the next 6 months.
  4. Conducted sign sweep of corridors and currently issuing work orders to install necessary “one way” and appropriate “speed limit” signs between Broadway and Yosemite. 
  5. Calibrated existing speed feedback signs and exploring potential locations of new/additional speed feedback signs.

 

Click here to watch the recording of the March 15 community safety meeting.

Click here to read the FAQs.(PDF, 122KB)

Click here to read the data from the Denver Police Department on 13th and 14th Avenues.(PDF, 289KB) 

Exposition Avenue

My office sponsored and funded a traffic study of Exposition Avenue from Quebec Street to Leetsdale Drive, including the Monaco Intersection. Click here to read the recommendations from that traffic study.(PDF, 1MB)

There were three virtual meetings:

The virtual kickoff community meeting was held on February 27.

The virtual data collections meeting was held on May 21.

The virtual recommendations meeting was held on September 24.

Holly Street

My office sponsored and funded a traffic study of Holly Street between 8th Avenue and Leetsdale Drive to identify problems and come up with solutions that the Department of Transportation and Infrastructure (DOTI) can implement to alleviate traffic problems on that road.

There was a community meeting held on May 6. Thanks to the 190 residents who registered to view the recommendations from this traffic study. Click here to watch a recording of that meeting and click here to view the presentation(PDF, 6MB).

Our office and Fehr and Peers put together a complete memorandum(PDF, 1MB)  on the proposed changes.

Our office is now working with DOTI to fund and implement these changes and improve traffic along Holly Street.

South Dayton Street

Our office sponsored and funded a traffic study of South Dayton Street between Alameda Ave and Mississippi Ave to identify problems and come up with solutions that the Department of Transportation and Infrastructure (DOTI) can implement to alleviate traffic problems on that road and to improve crossings for people walking and biking.

Watch the February 3rd community input meeting and the slide deck can be viewed here.(PDF, 2MB)

Watch the June 28 community meeting and the slide deck can be viewed here.(PDF, 3MB)

Watch the August 30 traffic recommendations community meeting and the slide deck can be viewed here.(PDF, 2MB)

Watch the January 14 parking meeting.

If you'd like to take a deeper dive, feel free to peruse the complete memorandum(PDF, 196KB), the cost estimates(PDF, 228KB), and a simplified one-pager(PDF, 496KB) as well. 

Our office is now working with DOTI to fund and implement these changes and improve traffic along South Dayton Street. 

Let s make dayton street safer graphic

Uinta Way

Our office is sponsoring and funding a traffic study of Uinta Way from 11th Avenue to Lowry Boulevard

Click here to watch the March 1 virtual kickoff community meeting

Click here to watch the May 16 Uinta Way Traffic Study Virtual Data Collection Meeting

Click here to watch the June 28 Uinta Way Traffic Study Recommendations Meeting

Find more information on the project by clicking here(PPTX, 21MB)

Our office and DOTI put together a complete memorandum(PDF, 641KB) on the proposed changes.

If you'd like to take a deeper dive, feel free to peruse the collected traffic counts(PDF, 605KB) and the concepts(PDF, 5MB) as well. 

We received a Uinta Way Cost Estimation document access that here.(PDF, 109KB)

Our office is now working with DOTI to fund and implement these changes and improve traffic along Uinta Way

7th Avenue Bikeway

Prior to representing the Cherry Creek and Country Club neighborhoods, the Department of Transportation and Infrastructure designed, funded, and then installed many changes to 7th Avenue. In response to community feedback, my office hosted a community meeting just three days after I began representing these neighborhoods. Click here to watch that community meeting.

The Department of Transportation and Infrastructure (DOTI) committed to continuing to study the corridor to make additional improvements as needed. Click here to read DOTI's memo.(PDF, 298KB)

Request a SLOW DOWN Signs

You may have seen these around the neighborhood already! Our office created SLOW DOWN signs and has been distributing them to neighbors to put in their yards. If you'd like a sign or know somebody who does, please email us and we'll set up a time to deliver or have you pick them up! 

No results found. Please try searching again.