2025 WMD Pipe and Manhole Rehabilitation, Phase 3 Reference number: Contract No. 202582818 Closing date February 19, 2026, 10:00 AM The purpose of this project is to rehabilitate deteriorating sanitary and storm pipes and manholes using trenchless methods. The manholes will be rehabilitated using approved lining methods and materials specified in accordance with the manhole rehabilitation specifications. The pipes will be rehabilitated using Cured-In-Place Pipe (CIPP). Status: Open
2026 Hot-In-Place Recycling and Repaving Reference number: Contract No. 202682911 Closing date February 18, 2026, 01:00 PM The work will consist of roto-milling asphalt pavement and paving the top lift using a hot-in-place recycling treatment. Work will be performed citywide. The work includes traffic control, installation of signs and pavement markings, and public information. Status: Open
2026 Citywide Chip Seal and Crack Seal Reference number: Contract No. 202682986 Closing date February 18, 2026, 11:00 AM Cape seal and crack seal work will be performed in various locations throughout the City and County of Denver. Approximately 125 lane miles, primarily consisting of local streets, will be treated with cape seal resurfacing (chip + slurry). Status: Open
2026 Citywide ADA Ramp & Concrete Repair B Reference number: Contract No. 202582814 Closing date February 17, 2026, 11:00 AM Work will include the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration. Status: Open
Federal Boulevard Medians Reference number: Contract No. 202578365 Closing date February 10, 2026, 11:00 AM The project is for construction of stamped concrete medians with the roadway along Federal Blvd within the City and County of Denver. The median locations are from 51st Avenue to I-70, 55rd Avenue to 29th Avenue, and Harvard Avenue to Floyd Avenue. Status: Open
Tennessee & Oneida Storm System Phase 3 Reference number: Contract No. 202582578 Closing date February 10, 2026, 10:00 AM The Tennessee & Oneida Storm Phase 3 project is the 3rd of 4 phases to complete the entire reach that will relieve flooding in S Oneida St at the existing sump located just north of Tennessee Ave. Phase 3 will install 8’ x 7’ RCBC in Mississippi Ave from approximately 100’ east of S Monaco St Pkwy, where Phase 2 was completed. Status: Open
RFQ: Welton Street Study Reference number: Solicitation No. 202582461 Closing date February 03, 2026, 01:00 PM The Department of Transportation & Infrastructure (“DOTI”), City and County of Denver (“City”), has issued a Request for Qualifications (the “RFQ”) for the Welton Street Study RFQ documents will be available for download at www.bidnetdirect.com/cityandcountyofdenverdoti. Status: Open
CCD FY18 HSIP PKG 2 Traffic Signal Replacement Reference number: Contract No. 202582284 Closed January 20, 2026, 02:00 PM The scope of work for this project includes signing, striping, removals, concrete, asphalt, signal, and landscaping work to update the intersections at 2 locations in the City and County of Denver. Status: Open
Mississippi Ave Vision Zero Safety Project Reference number: Contract No. 202581736 Closed December 18, 2025, 10:00 AM The project will remove one through lane in each direction on Mississippi Ave. from Quivas to Eliot St. Raised medians will be constructed to restrict turns from side-streets while still allowing left turns from Mississippi Ave to select side streets. It will also build curb extensions and ADA ramp replacement at various intersections throughout the project limits. Status: Open