Welcome to Work4Denver

On this site you will find information for bidding on upcoming construction projects, service opportunities, submit requests for proposals and qualifications, and access to valuable information to keep you informed of the procedures and processes for a successful bidding experience.  

Below is a list of current opportunities! 

Current Bidding Opportunities

Oct 06, 2014 (376 reads)

General Statement of Work

This projects extends North University Outfall Phase 1 from 2nd/Josephine to 4th/Detroit.  The storm system extends up Columbine to 3rd Avenue, east on 3rd Avenue to Detroit, and north on Detroit to 4th.  The project consists of 42" to 48" mainline with laterals and inlets.  The storm system is designed to convey the 10-year storm event. This project will also include a complete mill and overlay from lip to lip on every street that is disturbed as part of the storm line construction.

Sep 30, 2014 (373 reads)
Located in Confluence Park where the South Platte River and Cherry Creek converge, the project removes two existing substandard trail ramp structures in Shoemaker Plaza; and replaces them with a single, 12-foot wide, ADA compliant multi-directional ramp. The new regional trail ramp is an integral part of a new pedestrian plaza, stairway and other urban landscape improvements. In addition, theproject will provide 20 bicycle parking spaces and upgraded lighting.

Sep 26, 2014 (289 reads)

General Statement of Work

Denver Parks and Recreation will be renovating the irrigation in Washington Park along Downing street and improving the layout of paths in the large garden. The work will involve the installation of new mainlines, laterals, valves and heads, installation of concrete mow bands and some walks and crusher fines paths. Some of this pipe installation will require directional boring in order to avoid existing trees within the park. There will be some site demo required, erosion control and general landscape restoration of sod areas disturbed by the irrigation and path renovation work.

Architectural and Engineering Professional Services for Levitt Pavilion at Ruby Hill Park  Sep 12, 2014 (510 reads)
CANCELLED 201417968 High Street Outfall Phase 2a BID CANCELLED  Sep 03, 2014 (754 reads)

Page 1


Feedback