WEEKLY ROAD LANE/STREET CLOSURES 

           May 28 June 4, 2012


ROAD Closure = NO PARKING

 

            Location:         1st Ave S.B.: Downing to Lafayette

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         1st Ave N.B.: Lafayette to Downing

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        ABCO CONTRACTING INC

 

            Location:         3rd Ave: Broadway  to Santa Fe

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        KEENE CONCRETE

 

            Location:         3rd Ave: Colorado Blvd to Cherry St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Colorado Blvd to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 3/1/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Tree Trimming

            Contractor:        Swingle Lawn, Tree & Landscape Care

 

            Location:         6th Ave: Forest St to Dahlia St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         6th Ave: Fox to Delaware

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         8th Ave: Speer Blvd to Delaware

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Crane service

            Contractor:        DENVER HEALTH HOSPITAL

 

            Location:         11th Ave: Galapago to Delaware

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         12th Ave W.B. east of Colorado Blvd

            Type:                Close 3rd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         13th Ave: Decatur to Umatilla

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 7/14/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CHATO'S CONCRETE LLC

 

            Location:         13th St: Arapahoe to Champa

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/31/2012

            Time:                Tue 7pm ‑ Thur 6am

            Purpose:           Special Event

            Contractor:        Service Employees International Union

 

            Location:         14th Ave: Broadway to Lincoln

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         14th Ave: Bannock/Delaware & Galapago/Elati

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         14th Ave: Cherokee to Broadway

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 9am ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         14th Ave: Delaware/Elati

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/2/2012 ‑ End Date: 6/3/2012

            Time:                6AM TO 6PM

            Purpose:           ROW Occupancy

            Contractor:        EMERGENCY POWER SERVICES CO.

 

            Location:         14th Ave: Eudora St to Fairfax St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         14th St. Market to Lawrence

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day

            Purpose:           Special Event

            Contractor:        Lower Downtown Denver Arts Association

 

            Location:         14th St: Market to Colfax

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/1/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        CONCRETE WORKS OF COLORADO INC

 

            Location:         14th St: Court to Colfax

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         15th St: Boulder St to Platte St

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/16/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        CDOT

 

            Location:         15th St: Delgany to Wewatta

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/12/2012

            Time:                8:30am to 3:30pm   No Weekends

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

           

            Location:         15th St: Cleveland Place to Colfax

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         16th St: Boulder to Central

            Type:                Peak Lane Closure

            Date:                Start Date: 10/17/2011 ‑ End Date: 10/17/2012

            Time:                8:30am to 3:30pm     24 hrs/day

            Purpose:           ROW Occupancy

            Contractor:        HOLLAND CONSTRUCTION

 

            Location:         17th St N.B.: Wewatta to Chestnut

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         17th St S.B.: Chestnut to Wewatta

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         22nd St: Blake to Market

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm   No Weekends   No Holidays

            Purpose:           Street Cut/Utilities

            Contractor:        PAULEY CONSTRUCTION INC

 

            Location:         32nd Ave: Irving to Julian

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         38th Ave: Tennyson to Sheridan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/19/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         40th Ave at Central Park Blvd.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 3/21/2012 ‑ End Date: 6/22/2012

            Time:

            Purpose:           Street Cut/Water

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         40th Ave.: Central Park Blvd to Havana St.

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 6/11/2012

            Time:                24 hrs/day 7a ‑ 5p

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         40th Ave at York St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 6/18/2012

            Time:                No Weekends   7A TO 9P

            Purpose:           Utility

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         40th Ave: Walnut/Franklin to Blake/40th St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm   No Weekends

            Purpose:           Safety

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         51st Ave W.B.: Havana to Ironton

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         51st Ave W.B.: Uvalda to Vaughn

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Fiber Optics

            Contractor:        ADVANCED UNDERGROUND INC

 

            Location:         53rd Ave W.B. turn lane to S.B. Chambers Rd

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         56th Ave W.B. turn lane to S.B. Chambers Rd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         56th Ave E.B.: Havana to Valentia

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         56th W.B.: Havana to Valentia

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         56th Ave E.B.: Quebec to Spruce

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 6/22/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         56th Ave: Spruce to Havana

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 2/9/2012 ‑ End Date: 6/24/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         56th Ave (Shoulders Only): Quebec to Havana

            Type:                Peak Lane Closure

            Date:                Start Date: 2/21/2011 ‑ End Date: 6/21/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Alameda: Downing to Corona

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑OUTDOOR LIGHTING

 

            Location:         Alameda: Gilpin to Humboldt

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/30/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑OUTDOOR LIGHTING

 

            Location:         Alameda: Williams to High

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/29/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        XCEL ENERGY‑ OUTDOOR LIGHTING

 

            Location:         Arapahoe St: 17th St. to 15th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Bannock: 14th Ave to 13th Ave

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 9am ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Bannock: Colfax to 14th Ave

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 5/31/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Thur 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Belleview Ave: I-225 & Monaco to Yosemite

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        GOLDSMITH METROPOLITAN DISTRICT

 

            Location:         Belleview Ave: Monaco to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 6/25/2012

            Time:                CDOT 9am‑3pm

            Purpose:           Site Work

            Contractor:        ValleyCrest Landscape Maintenance

 

            Location:         Boulder: 15th to 16th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/17/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        RIO LLC

 

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure

            Date:                Start Date: 6/2/2012 ‑ End Date: 10/13/2012

            Time:                7:00am ‑ 3:00pm

            Purpose:           Special Event

            Contractor:        Highlands United Merchants Inc

 

            Location:         Broadway: 16th to Colfax

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/12/2012 ‑ End Date: 5/12/2013

            Time:                7:00am ‑ 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Broadway: 19th St to 13th Ave

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Broadway: Mississippi to Tennessee

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Broadway N.B.: Harvard to Evans

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/19/2012 ‑ End Date: 6/19/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Broadway: Asbury to Warren

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Broadway: Warren to Asbury

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

 

            Location:         Central St: 15th St to 20th St

            Type:                Peak Lane Closure

            Date:                Start Date: 1/16/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        CDOT

 

            Location:         Chambers Rd: 56th Ave to G.V.R. Blvd

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd N.B. turn lane to W.B. 52nd Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd N.B. turn lane to W.B. Maxwell Pl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd S.B. turn lane to E.B. Maxwell Pl

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd N.B. turn lane to west side of retail

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd S.B. turn lane to east side of retail

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd S.B.: travel lane north of G.V.R. Blvd

            Type:                Close 3rd Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd S.B. turn lane to E.B. G.V.R. Blvd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Chambers Rd S.B. turn lane to E.B. 53rd Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Champa: 14th St to Speer Blvd

            Type:                Close 1st Traffic Lane,2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/31/2012

            Time:                Tue 7pm ‑ Thur 6am

            Purpose:           Special Event

            Contractor:        Service Employees International Union

 

            Location:         Champa: 14th St. to 13th St.

            Type:                Peak Lane Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/31/2012

            Time:                Tue 7pm ‑ Thur 6am

            Purpose:           Special Event

            Contractor:        Service Employees International Union

 

            Location:         Champa: 17th St. to 15th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Champa: 20th to19th

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        M A MORTENSON COMPANY

 

            Location:         Cherry St & Birch St: 4th Ave to 3rd Ave

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                7:00am to 10:00pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Cheyenne Place: Broadway to Colfax

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 9am ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Clarkson: 12th Ave to 13th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Clay St: 39th Ave to 40th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/30/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Sewer

            Contractor:        INSITUFORM TECHNOLOGIES INC

 

            Location:         Colfax Ave E.B.: Sheridan to Yates

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm 6:00pm to 10:00pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave W.B.: Yates to Sheridan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave: Perry to Osceola

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        JIM BLACK CONSTRUCTION INC

           

            Location:         Colfax Ave W.B.: Irving to Julian

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave E.B.: Julian to Irving

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/11/2012 ‑ End Date: 5/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        T2 CONSTRUCTION INC

 

            Location:         Colfax Ave E.B.: Speer Blvd to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave: Speer Blvd to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/23/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Colfax Ave W.B.: Court to Welton

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Improvements

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave E.B.: Cherokee to Lincoln

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Colfax Ave W.B.: Lincoln to Cherokee

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure, Peak Lane Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day Fri 7pm ‑ Mon 3am

            Purpose:           Special Event

            Contractor:        Capitol Hill United Neighbors Inc

 

            Location:         Colfax Ave E.B.: Lincoln to Pennsylvania

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave E.B.: Logan to Clarkson

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave E.B.: Downing to St. Paul

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 7/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave W.B.: St Paul St to Columbine

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 7/28/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        KECI COLORADO INC

 

            Location:         Colfax Ave: Fairfax St to Elm St, turn lane

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Colorado Blvd north and south of 12th Ave intersection

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Type:                Close 3rd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd south of 12th Ave intersection

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd S.B. left turn at 12th Ave intersection

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/16/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        INTERFACE COMMUNICATION COMPANY

 

            Location:         Colorado Blvd: 2nd Ave to 4th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/19/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        MAINLINING SERVICE INC

 

            Location:         Curtis: 15th St. to 17th St.

            Type:                Close 1st Traffic Lane, 2nd Traffic Lane, 3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Delaware: 5th Ave to 7th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Downing: 18th Ave to 22nd Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Curb and Gutter

            Contractor:        THOUTT BROTHERS CONCRETE CONTRACTORS INC

 

            Location:         Downing: 20th Ave to 21st Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        BELAIR BUILDERS INC DBA BELAIR EXCAVATIN

 

            Location:         Elati: 6th Ave to 7th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/18/2012 ‑ End Date: 6/1/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Ellsworth: Bannock to Cherokee

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Elm St: Colfax Ave to 13th Ave

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/14/2012 ‑ End Date: 6/4/2012

            Time:

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Evans Ave east and westbound: High to Columbine

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 6/2/2012 ‑ End Date: 6/3/2012

            Time:                7:00am to 9:00pm

            Purpose:           Street Cut/Water

            Contractor:        OE CONSTRUCTION CORPORATION

 

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/2/2012 ‑ End Date: 6/3/2012

            Time:                7:00am to 9:00pm

            Purpose:           Street Cut/Water

            Contractor:        OE CONSTRUCTION CORPORATION

 

            Location:         Evans Ave E.B.: Acoma to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave: Acoma to Lincoln

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 6/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave W.B.: Lincoln to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 9/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Evans Ave E. B.: Cherokee to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/27/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Occupancy

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY 

           

            Location:         Evans Ave: Kalamath to Galapago

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 7/3/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Evans Ave W.B.: Galapago to Lipan

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑NORTH METRO

 

            Location:         Federal Blvd: Tennessee to Arizona

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Federal Blvd: Tennessee to Mississippi

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Florida: Lowell to Meade

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:

            Contractor:        WATER BOARD

 

            Location:         Glenarm: 15th to 17th

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/25/2012 ‑ End Date: 5/28/2012

            Time:                24 hrs/day 12am Fri‑11:59pm Mon

            Purpose:           Special Event

            Contractor:        Downtown Denver Arts Fest ‑ Dancing Kids

 

            Location:         G.V.R. Blvd W.B.: Pena to Telluride

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 6/1/2012

            Time:                8:30am ‑ 2:00pm

            Purpose:           Site Work

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         G.V.R. Blvd E.B.: Pena to Telluride

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 6/1/2012

            Time:                8:30am ‑ 2:00pm

            Purpose:           Site Work

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         G.V.R. Blvd E.B.: Walden to Telluride

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        PAULEY CONSTRUCTION INC

 

            Location:         Havana S.B.: 56th Ave to 54th Ave

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 3/27/2012 ‑ End Date: 6/30/2012

            Time:                24 hrs/day

            Purpose:           ROW Construction

            Contractor:        CASTLE ROCK CONSTRUCTION COMPANY

 

            Location:         Havana ‑ 3710 north. ‑ south of Smith Road back to bridge

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 6/22/2012

            Time:                24 hrs/day

            Purpose:           Road / Alley Repair

            Contractor:        FCI CONSTRUCTORS INC

 

            Location:         Havana at 37th Ave

            Type:                Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 2/6/2012 ‑ End Date: 5/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         Havana S.B. at 37th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 2/6/2012 ‑ End Date: 5/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        REYNOLDS‑TIERDAEL

 

            Location:         Havana N.B.: 50th Ave to 52nd Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/6/2012

            Time:                8:30am to 3:30pm

            Purpose:           Boring &/or Wells

            Contractor:        SAGE TELECOMMUNICATIONS CORP

           

            Location:         Irving: 19th Ave to 20th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Larimer: 15th St. to N.B. Speer Blvd

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day

            Purpose:           Special Event

            Contractor:        Lower Downtown Denver Arts Association

 

            Location:         Larimer: 17th St to 15th St

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/4/2012

            Time:                24 hrs/day

            Purpose:           Special Event

            Contractor:        Lower Downtown Denver Arts Association

 

            Location:         Lawrence: 20th to 21st

            Type:                Peak Lane Closure

            Date:                Start Date: 3/3/2012 ‑ End Date: 7/2/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        SHAW BUILDERS LLC

           

            Location:         Leetsdale Drive at Monaco

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        NORAA CONCRETE CONSTRUCTION CORP

 

            Location:         Louisiana: Logan to Washington

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/17/2012 ‑ End Date: 6/15/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Sewer

            Contractor:        BT CONSTRUCTION INC

 

            Location:         Lowell Blvd: Mexico to Florida

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/4/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:

            Contractor:        WATER BOARD

 

            Location:         Maxwell Pl: Granby to Chambers Rd

            Type:                Close 1st Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 10/12/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Water

            Contractor:        T. LOWELL CONSTRUCTION INC

 

            Location:         Milwaukee intersection at E. 26th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/30/2012 ‑ End Date: 8/3/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Water

            Contractor:        WATER BOARD

 

            Location:         Mississippi: Dayton to Elmira to Parker Rd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        EXCEL ENERGY‑SOUTHEAST METRO

 

            Location:         Mississippi E.B.: Federal Blvd to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi W.B.: Broadway to Federal Blvd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi: Federal Blvd to Platte River Dr.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi: Federal Blvd to Zuni

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Mississippi: Zuni to Platte River Dr

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 4/16/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         M.L.K. Blvd: Gaylord to Vine

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         M.L.K. Blvd intersection at Gaylord

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/3/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Monaco Pkwy: Tennessee to Exposition Ave.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 6/4/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        NORAA CONCRETE CONSTRUCTION CORP

 

            Location:         Monaco : Belleview Ave to Union Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/28/2012 ‑ End Date: 6/25/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        ValleyCrest Landscape Maintenance

 

            Location:         Park Ave West: Larimer to Walnut

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm   Weekends 7:00am to 10:00pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/26/2012

            Time:                Weekends 7:00am to 10:00pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Patton Court ‑ Exposition Ave. to Mississippi Ave.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/20/2012

            Time:                8:30am to 3:30pm

            Purpose:           Rotomill / Overlay

            Contractor:        STREET MAINTENANCE‑DEPT OF PUBLIC WORKS

 

            Location:         Peoria St: 45th Ave to 47th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/22/2012 ‑ End Date: 6/15/2012

            Time:                8:30am to 3:30pm

            Purpose:           Utility

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Perry: 13th Ave to 14th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/30/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Quebec N.B underpass.: Smith Rd to Sandown Rd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 7/28/2012

            Time:                No Weekends  24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         Quebec S.B. underpass : Sandown Rd to Smith Rd

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 7/28/2012

            Time:                No Weekends  24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        DENVER TRANSIT CONSTRUCTORS LLC

 

            Location:         Sherman: 17th Ave to 18th Ave

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/29/2012

            Time:                7:00am ‑ 9:30am

            Purpose:           Special Event

            Contractor:        Service Employees International Union

 

            Location:         Speer Blvd: 12th Ave to 13th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Occupancy

            Contractor:        A‑1 GLASS INC

 

            Location:         Speer Blvd N.B.: Broadway to Elitch Cir

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Speer Blvd S.B.: Elitch Cir to Broadway

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Syracuse St. ‑ 3201 north ‑ close lanes on east and then west sides of street

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/29/2012

            Time:                8:30am to 3:30pm

            Purpose:           Fiber Optics

            Contractor:        SAGE TELECOMMUNICATIONS CORP

 

            Location:         Tejon: Mississippi to Tennessee

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/23/2012 ‑ End Date: 6/11/2012

            Time:                8:30am to 3:30pm

            Purpose:           Traffic Signal Installation

            Contractor:        COLORADO BORING CO

 

            Location:         Union Ave: Syracuse to Newport

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Close 3rd Traffic Lane

            Date:                Start Date: 10/28/2011 ‑ End Date: 8/31/2012

            Time:                24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        EDWARD KRAEMER & SONS INC

            Location:         Union Ave E.B.: Quebec to Syracuse

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 9/23/2011 ‑ End Date: 8/31/2012

            Time:                24 hrs/day

            Purpose:           Bridge Construction

            Contractor:        Edward Kraemer & Sons, Inc

 

            Location:         Union Ave W.B.: Syracuse to Quebec

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 9/22/2011 ‑ End Date: 8/31/2012

            Time:                7a‑3:30p & 6p‑5a

            Purpose:           Bridge Construction

            Contractor:        Edward Kraemer & Sons, Inc

 

            Location:         University Blvd: Alameda to Columbia Pl.

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/30/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Tree Trimming

            Contractor:        Colorado Tree Shrubbery Specialists

 

            Location:         University Blvd: 1st Ave to Alameda

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        STRUCTURES INC

 

            Type:                Close 2nd Traffic Lane

            Date:                Start Date: 5/21/2012 ‑ End Date: 5/26/2012

            Time:                8:30am to 3:30pm

            Purpose:           Bridge Construction

            Contractor:        STRUCTURES INC

 

            Location:         University Blvd: Evans to Warren

            Type:                Peak Lane Closure

            Date:                Start Date: 5/23/2011 ‑ End Date: 11/30/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        SHAW BUILDERS LLC

 

            Location:         Uvalda N.B.: 51st Ave to Elmendorf

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/24/2012 ‑ End Date: 5/30/2012

            Time:                8:30am to 3:30pm

            Purpose:           Fiber Optics

            Contractor:        ADVANCED UNDERGROUND INC

 

            Location:         Walnut: Park Ave West to 24th St

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane

            Date:                Start Date: 6/3/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           Site Work

            Contractor:        COLORADO STRUCTURES INC

 

            Location:         Welton: 15th St. to 17th St.

            Type:                Close 1st Traffic Lane,2nd Traffic Lane,3rd Traffic Lane, Road Closure

            Date:                Start Date: 5/26/2012 ‑ End Date: 5/27/2012

            Time:                3:00 am ‑ 12:01 am

            Purpose:           Special Event

            Contractor:        Concert for Kids

 

            Location:         Welton: 17th St to 18th St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/29/2012 ‑ End Date: 6/29/2012

            Time:                24 hrs/day

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑STEAM HEAT & DISTRICT COOLING

 

            Location:         Wewatta E.B.: 16th St to 19th St

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         Wewatta W.B.: 19th St to 16th St

            Type:                Close 1st Traffic Lane, Peak Lane Closure

            Date:                Start Date: 1/1/2012 ‑ End Date: 12/31/2012

            Time:                24 hrs/day

            Purpose:           Site Work

            Contractor:        KIEWIT WESTERN CO

 

            Location:         Wynkoop St. close s/w end of block. (inc.) north end of ped bridge

            Type:                Close 1st Traffic Lane, Close 2nd Traffic Lane, Road Closure

            Date:                Start Date: 6/1/2012 ‑ End Date: 6/2/2012

            Time:                24 hrs/day

            Purpose:           Special Event

            Contractor:        Messner Foundation

 

            Location:         Yale & Vassar

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 6/4/2012 ‑ End Date: 6/8/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        SILVA CONSTRUCTION INC

 

            Location:         Zuni: 28th Ave to 29th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/31/2012 ‑ End Date: 5/31/2012

            Time:                8:30am to 3:30pm

            Purpose:           Street Cut/Utilities

            Contractor:        XCEL ENERGY‑CENTRAL METRO

 

            Location:         Zuni S.B.: Lower Colfax to 8th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 7/14/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CHATO'S CONCRETE LLC

 

            Location:         Zuni N.B.: 8th Ave to 13th Ave

            Type:                Close 1st Traffic Lane

            Date:                Start Date: 5/25/2012 ‑ End Date: 7/14/2012

            Time:                8:30am to 3:30pm

            Purpose:           ROW Construction

            Contractor:        CHATO'S CONCRETE LLC

 

 

>

IMPORTANT: all information on this update is subject to change based on weather conditions.

 