Public Works Plans Review Services Electronic Review

Electronic Review

This site is for use by review entities previously notified by the City and County of Denver of a electronic plan review opportunity.
The following links contain Project documents and are made available for authorized reviewing entities to review and submit comments. Updates will be posted as available, allowing applicants to obtain status on projects. Please click on the appropriate link below to access review documents for the corresponding Project Number

Folders:

 (Root)\

 Request for Correction of MEP
 LATE COMMENT Denver 8 Cable Darryn Zuehlke_files
 Electronic Review 2012-0042-01 Parks Water Consrvtn Debrah Binard_files
 20120-0060-02_1st Temp MEP 1490 Delgany
 2012-0446-01_2nd Cherry Creek Street and Drainage Improvement CPEP 95 Percent
 2012-0239-01 Adrift Tiki 218 S Broadway
 2012-0234-01 Vacation of 12th St Welton to Glenarm
 2012-0220-01_1st_Wash Park SE Entry Design Parks 75 Percent
 2012-0214-01_1st_31st and 36th Outfall Study
 2012-0210-01 Dedication of S Jackson St Between Louisiana Ave and Florida Ave
 2012-0208-01 DEDICATION W Alameda Ave
 2012-0202-01 DEDICATION S Federal Blvd
 2012-0201-01 Vacation Wellington Apt Colfax Frontage
 2012-0193-02 Easement Relinq Boys and Girls Club
 2012-0187-01_1st Wash Park Diagonal Renovation 30 percent
 2012-0185-01_1st_City Park Museum Road Phase 1 3rd Final 95 Percent
 2012-0181-01 Temp MEP Cadence Apt 1920 17th St
 2012-0165-01 Covenant Relinquishment Porter Adventist Health
 2012-0163-01_1st New Parks Maint Facility Concept Plan
 2012-0146-01_2nd North Stapleton Truck Open Space 80 percent
 2012-0146-01_1st North Stapleton Trunk Open Space Parks 30 Percent
 2012-0145-01_1st Neighborhood House Renovation 95 percent
 2012-0138-01_1st CDOT Hampden US 285 CO Blvd SH 2 Intersection Reconstruction TEP
 2012-0127-01_1st submittal_ US 6_l-70 to l-76 Overlay_FOR
 2012-0125-01_E.R. 2907 Huron St
 2012-0114-01_1st Sun Valley Riverfront Park Phase 1 Concept Plan
 2012-0110-01 Vacation near 2900 Fox St
 2012-0105-01_1st Transportation Standards and Details 2012 revisions 60 percent
 2012-0096-01 MEP
 2012-0095-01_MEP 1336 E. 17th Ave
 2012-0092-01 Vacation 2727 W. 33rd Ave
 2012-0092-01 MEP 2727 W. 33rd Ave
 2012-0080-01_1st Washington St Widening Adams Cnty 52nd Ave - 58th Ave 60 Percent
 2012-0078-01_1st Sanderson Gulch Extend Detention Basin Utility 95 percent
 2012-0076-01_2nd Berkeley Dog Park 100 percent
 2012-0076-01_1st Berkeley Dog Park_90 percent
 2012-0068-01_1st_Police Command Vehicle Garage_100 percent
 2012-0064-01_1st Denver Traffic Improvement Project 2012 CPEP FOR
 2012-0062-01_2nd Denver Fire Station 18 CPEP 90 percent
 2012-0062-01_1st Denver Fire 18 CPEP 60 percent
 2012-0060-02_1st Temp MEP 1490 Delgany
 2012-0060-01 ER_15th Delgany-Wewatta Sts
 2012-0054-01_2nd Denver Parks NE Dist Central Control Improvements 95 percent
 2012-0054-01_1st Denver Parks NE Dist Central Control Improvements 95 Percent
 2012-0050-01_MEP DU_York and Jewell
 2012-0042-01_2nd 2012 General Storm Ph II 95 percent
 2012-0042-01_2012 General Storm Ph ll_60 percent
 2012-0042-01_1st 2012 General Storm Ph ll_60 percent
 2012-0038-01Dedication 1st Ave-Downing St and University Blvd
 2012-0037-01_Dedication_11th Ave-Tamarac and Verbena Strs
 2012-0036-01_Dedication_Colorado Blvd_
 2012-0032-01_2nd Comcast Franchise agreement 95 percent
 2012-0032-01_1st_PCO Comcast Franchise Agreement
 2012-0030-01_1st CDOT US 6 Bridges Knox Ct to BNSF
 2012-0025-01 Vacation 1936 W 32nd Ave
 2012-0024-01_1st Parks Revised Construction Specifications 60 Percent
 2012-0005-05 TW Telecom 8055 E Tufts Ave
 2012-0005-04_TW telcom Monaco at Alameda
 2012-0005-01 tw telecom 1999 Broadway
 2012-0003-29 Comcast 1190 Auraria Pkwy
 2012-0003-27 Comcast 300 S Dahlia St
 2012-0003-26 Comcast 1125 17th St
 2012-0003-25 Comcast 229 Vallejo St
 2012-0003-25 Comcast 1601 W Mile High Stadium Cir
 2012-0003-24 Comcast 400 E 8th Ave
 2012-0003-23 Comcast 15th St and Central St
 2012-0003-22 COMCAST 5025 Nome St and Peoria St
 2012-0003-21 Comcast 301 S. Harrison
 2012-0003-20 COMCAST 3835 Elm St
 2012-0003-19 Comcast 498 W Iliff Ave
 2012-0003-18 Comcast 1635 W 13th Ave
 2012-0003-17 Comcast 6900 Tower Rd
 2012-0003-16 Comcast 11000 E 53rd Ave
 2012-0003-15 Comcast 10885 E 51st Ave
 2012-0003-14 COMCAST 7555 E Hampden Ave
 2012-0003-13 Comcast 1155 S Inca St
 2012-0003-12 Comcast 4120 Jackson St
 2012-0003-11 Comcast 4721 Ironton St
 2012-0003-10 Comcast 4801 Tower Rd
 2012-0003-09 COMCAST 2175 S Platte River Dr
 2012-0003-08 Comcast 18600 E 63rd Ave
 2012-0003-07 Comcast 68th Ave and Tower Rd
 2012-0003-06 COMCAST 3400 E Bayaud Ave
 2012-0003-05 Comcast 3451 W. Girard Dr
 2012-0003-04 COMCAST 8055 E Tufts Ave
 2012-0003-03 Comcast Utility Review 5303 E Evans Ave
 2012-0003-028 Comcast 11100 E 45th Ave
 2012-0003-01 Comcast Utility Review 2018 S. Pontiac Way
 2012-0003
 2012-0002-30 Xcel at Logan St from 6th to 20th Ave
 2012-0002-29 Xcel GAS 27th Ave and Alcott St GAS
 2012-0002-28 Xcel 27th Ave and Alcott St ELECTRIC
 2012-0002-27 Xcel Joliet St and Kingston St
 2012-0002-26 Xcel 49th Ave and Andrews Dr
 2012-0002-25 Xcel Peoria 45th to 47th
 2012-0002-24 Xcel GAS Navajo and W. 10th Ave
 2012-0002-23 Xcel Navajo and W 10th
 2012-0002-22 Xcel 1050 S Broadway
 2012-0002-21 Xcel W. 13th Ave and Umatilla St
 2012-0002-20 Xcel Knox Ct Alameda to 6th Ave
 2012-0002-19 Xcel Iowa and S Sherman St
 2012-0002-18 Xcel W. 38th Ave and Inca St
 2012-0002-17 Xcel 18th St and Boulder St
 2012-0002-16 Xcel S Holly Pl and S Locust St
 2012-0002-15 Xcel 13th Ave and Zuni St
 2012-0002-13 Xcel 13th and Umatilla
 2012-0002-12 Private Use Xcel W. Colfax and Osage
 2012-0002-11 Xcel MLK Jr Blvd and Trenton St
 2012-0002-10 Xcel 52nd and Pecos St
 2012-0002-09 Xcel 8000 E Quincy Ave
 2012-0002-08 Xcel E. Cedar Ave and S. Corona St
 2012-0002-07 Xcel 3rd and Dexter
 2012-0002-06_UR 15th and Centrals Sts
 2012-0002-05 Xcel Cedar Ave and S. Jackson St
 2012-0002-04 XCEL 16th St and Boulder St
 2012-0002-03 Xcel E. Bayaud Ave and S. Corona St
 2012-0002-02 Xcel 2300 Walnut
 2012-0002-01 Xcel Utility Review at 9th Ave and Birch St
 2012-0001-49 CenturyLink 7001 Yampa St
 2012-0001-48 Private Use CenturyLink 1515 Harrison St
 2012-0001-47 CenturyLink W. Arkansas Ave and S. Acoma St
 2012-0001-46 CenturyLink 3301 W 31st Ave
 2012-0001-45 CenturyLink 1479 Cherry St
 2012-0001-44 CenturyLink 1691 S Dahlia St
 2012-0001-43 CenturyLink 1830 Franklin St
 2012-0001-42 CenturyLink 1900 S Dahlia St
 2012-0001-41 CenturyLink 1601 Albion St
 2012-0001-40 CenturyLink 2535 W. 27th Ave
 2012-0001-39 CenturyLink 2971 Lola St
 2012-0001-39 CenturyLink 2971 Iola St
 2012-0001-38 CenturyLink on 19th St bwtn Wazee St and Chestnut Pl
 2012-0001-37 CenturyLink 3200 Brighton Blvd
 2012-0001-36 CenturyLink on Grove St between W 33rd Ave and W 41st Ave
 2012-0001-35 CenturyLink 6275 E 39th Ave
 2012-0001-34 CenturyLink 4851 E Floyde Ave
 2012-0001-33 CenturyLink W. 43rd Ave and Inca st
 2012-0001-33 CenturyLink 43rd Ave and Inca st
 2012-0001-32 CenturyLink 1440 S Lipan St
 2012-0001-31 CenturyLink 13195 E 51st Ave
 2012-0001-30 CenturyLink 5302 Peoria St
 2012-0001-28 CenturyLink 602 S Lipan St
 2012-0001-27 Private Use CenturyLink S Eliot st and W Tennessee Ave
 2012-0001-27 Private Use CenturyLink S Eliot st and W Tennesse Ave
 2012-0001-26 Private Use CenturyLink 5200 Peoria St
 2012-0001-25 CenturyLink Private Use 4900 Peoria St
 2012-0001-24 CenturyLink 13303 Maxwell Pl
 2012-0001-23 CenturyLink 1117 Cherokee St
 2012-0001-22 CenturyLink 1611 Mile High Stadium Circle
 2012-0001-21 CenturyLink 3801 Quebec St
 2012-0001-20 PRIVATE USE 3194 Meade St
 2012-0001-19 Private Use CenturyLink Fife Ct and Caithness Pl
 2012-0001-18 CenturyLink 4202 Eliot St
 2012-0001-17 UR-3088 W. Denver Pl
 2012-0001-16 Private Use CenturyLink 4909 Beach Ct
 2012-0001-15 CenturyLink 2777 Mile High Stadium Circle
 2012-0001-14 PRIVATE Use CenturyLink 3201 Raleigh St
 2012-0001-13 CenturyLink 3430 Grove St
 2012-0001-12 CenturyLink 3131 W 41st Ave
 2012-0001-11 CenturyLink 2912 W. 34th Ave
 2012-0001-09_UR 3485 W 49th Ave
 2012-0001-08 CenturyLink 3821 Eliot St
 2012-0001-07 CenturyLink 7755 E 56th Ave
 2012-0001-06 CenturyLink 4141 Colorado Blvd
 2012-0001-05 CenturyLink 68th Ave and Tower Rd
 2012-0001-04 CenturyLink 4501 Federal Blvd
 2012-0001-03 CenturyLink 1101 Bannock St
 2012-0001-02__Utility-Private Use_So Hazel Ct and W. Ada Pl
 2012-0001-01 CenturyLink 11th St and Auraria Pkwy
 2011-0634-07_Dedication-Mile High Stadium West Circle
 2011-0634-06_Dedication Curtis and 5th Sts
 2011-0633-02 Dedication at S. Broadway
 2011-0633-01 Dedication at W. Evans Ave
 2011-0632-01 Dedication at Tower Rd
 2011-0631-01 Dedication Alameda Ave
 2011-0628-01_Sanderson Gulch Channel Improvements_90 percent
 2011-0628-01_2nd Sanderson Gulch Channel Improvements_100 percent
 2011-0627-01_MEP DHA Mariposa Phase ll-10th Ave 2nd submittal
 2011-0627-01_MEP DHA Mariposa Phase ll-10th Ave
 2011-0624-01_MEP 2828 E. 6th Ave
 2011-0621-01_1st_Capital Trans Project Template Specs
 2011-0601-01_2nd Federal Aid Project FSA 002A-005 State Highway 2_Final plans
 2011-0601-01_1st Federal Aid Project No. FSA 002A-005 State Highway No. 2 FOR
 2011-0598-01_1st Washington Park Diagonal Area Plan Inception
 2011-0597-01_3rd_DW Cond 308 and Montbello Rcycld Dist Mains 100 percent
 2011-0597-01_2nd_DW Cond 308 and Montbello Rcycld Distr. Mains 90 percent
 2011-0597-01_1st_DW Conduit No.308-Montbello recycled water dist.mains
 2011-0596-01_3rd Cesar Chavez Park Improvements 100 percent
 2011-0596-01_2nd submittal_Cesar Chavez Park Improvements_100 percent
 2011-0596-01_1st Cesar Chavez Park 95 Percent
 2011-0595-01_1st Evergreen GC Bridge Replacement FIR
 2011-0593-10 Xcel Utility Review E. Virginia Ave and S. Lafayette St
 2011-0593-02 Xcel Utility Review E. Brighton Blvd and 35th St
 2011-0588-01_U.R._25th-Curtis-Arapahoe-Walnut
 2011-0584-01_MEP Spire Media Bldg
 2011-0578-01_MEP_1610 16th St
 2011-0576-01 661 Williams St MEP
 2011-0571-02_1st West Dakota Outfall Storm 60 percent
 2011-0568-01_4th Cherry Creek Pedestrian Bridge at Kentucky Ave 100 percent
 2011-0568-01_3rd Cherry Creek Pedestrian Bridge at Kentucky Ave. 95 percent
 2011-0568-01_3rd Cherry Creek Pedestrain Bridge at Kentucky Ave. 95 percent
 2011-0568-01_2nd Cherry Creek Pedestrian Bridge at Kentucky Ave
 2011-0568-01_1st_Cherry Creek Pedestrian Bridge at Kentucky Ave
 2011-0568-01_
 2011-0565-01_1st 20th and Grant Intersection Improvement CPEP Parks Final
 2011-0560-01_1st CDOT Havana Street Overlay-FIR
 2011-0555-01 Auraria Learning and Engagement Bldg Easement Relinquishment
 2011-0533-01_MEP 707 Office Building entrance
 2011-0525-01_3rd SHE 2011 Pkg 2 Traffic Signal Upgrade CPEP 100 percent
 2011-0525-01_2nd SHE 2011 Pkg 2 Traffic Signal Upgrade CPEP 95 percent
 2011-0525-01_1st SHE 2011 Package 2 Traffic Signal Upgrade CPEP FOR
 2011-0516-01_2nd MEP
 2011-0516-01 Temp MEP
 2011-0515-01_2nd Washington Park Running Trail Bridge 100 percent
 2011-0515-01_1st Washington Park Run Trail bridge 95 percent
 2011-0514-02_3rd ZAYO
 2011-0514-02_2nd ZAYO
 2011-0514-02 ZAYO
 2011-0514-01 Zayo - NW side of Brighton Blvd between 38th and 43rd St
 2011-0513-01_2nd Overhead Sign Bridge Replacement Phase II 100 percent
 2011-0513-01-1st Overhead Sign Bridge Replacement Project Phase II FOR
 2011-0509-01_1st Civic Center Park Irrigation Rehab 90 percent
 2011-0508-01_1st 1498 Irving
 2011-0507-01_1st_Sand Creek Trail 47th Street Underpass
 2011-0506-01_2nd Red Rocks Bridge Replacement FOR
 2011-0506-01_1st Red Rocks Bridge Replacement FIR
 2011-0502_3rd CDOT Pecos over l-70 Bridge Access and Easements Mods-60 percent
 2011-0502-01_4th CDOT 18149 Pecos Over I-70 Bridge Replacement Full Set 60 percent
 2011-0502-01_2nd submiital_CDOT Pecos over l-70 bridge replacement
 2011-0492-01_1st_2010 Sanitary Open Cut_Construction Plan
 2011-0484-01_MEP for_419 W 13th Ave
 2011-0481-44 Xcel Ellsworth and Corona
 2011-0481-41 Xcel 19th St and Chestnut Pl
 2011-0481-24 Xcel Colfax Ave and Lowell Blvd
 2011-0481-21_Smith Road and Dahlia
 2011-0477-01_MEP Parking Garage 16th and Wewatta Streets
 2011-0473-01_1st Barnum East Park Concept Plan
 2011-0465-04_MEP Broadstone 2120 Blake St
 2011-0461-01_1st MEP Northfield Stapleton
 2011-0458-01_1st General Contract Conditions Update Policy Review_95 Percent
 2011-0455-01 MEP E 54th Ave and Garfield St
 2011-0451-01_1st Cherry Creek Dr South Interim Ped Improvement CPEP 100 percent
 2011-0449-01_3rd_Union Ave over I-25 100 percent
 2011-0449-01_2nd Union Ave over I-25 Transit Improvement 100 percent
 2011-0449-01_1st_Union Ave over I-25 90 percent
 2011-0443-01_3rd_2012 General Storm Ph 1_Storm 100 percent
 2011-0443-01_2nd_2012 General Storm Ph 1_Storm 95 percent
 2011-0443-01_2012 General Storm_60 percent
 2011-0440-04_54th Pl MEP
 2011-0432-01 MEP
 2011-0426-01_1st Hampden Heights Storm Sewer Improvements - Phase 2 60 Percent
 2011-0416-01_3rd Weir Gulch Trail Renovation 2nd 100 Percent
 2011-0416-01_2nd_Weir Gulch Trail Renovation 100 percent
 2011-0415-01_4th West Denver New Branch Library Final 100 percent
 2011-0415-01_3rd_West Denver New Branch Library CPEP As-Built
 2011-0400-01_4th_2011 SHE Package 1 Traffic Signal Upgrade 100 percent
 2011-0400-01_3rd_2011 SHE Package 1 Traffic Signal Upgrade 95 percent
 2011-0396-01_1st_Denver Water Conduit No 151 100 percent
 2011-0394-01_3rd_Goldsmith Gulch Cook Park Channel Improvements 100 percent
 2011-0393-02_1st_Exposition Realignment at Vanderbilt Habitat Concept
 2011-0390-07 Temp MEP Residences at 19th and Logan
 2011-0390-04 MEP Residences at 19th and Logan 2nd submittal
 2011-0390-04 MEP Residences at 19th and Logan 1st submittal
 2011-0364-03_1st Federal Blvd 5th Ave to Howard CPEP Proj Inception
 2011-0361-07 Vacation DHA Mariposa-2 alleys
 2011-0348-01 Auraria Utility Review 2nd submittal
 2011-0348-01 Auraria Utility Review 1st submittal
 2011-0336-04_MEP Villas at Regency 2555 31st St
 2011-0327-01_2nd Benedict Fountain Park Improvements 50 percent
 2011-0305-07 MEP Riverfront Park
 2011-0304-01_2nd Denver Water Elizabeth St Pump Station Conversion Utility 100 percent
 2011-0301-01_2nd Denver Water Conduit 58 Replacement FOR
 2011-0300-10 Temp MEP Arapahoe Square 2300 Walnut
 2011-0300-08 MEP 2300 Walnut Arapahoe Square
 2011-0300-07 Easement Relinq. Arapahoe Square 2300 Walnut
 2011-0299-04 G4S 1475 Lawrence St
 2011-0297-04_ER-619 Logan St
 2011-0293-01 MEP BNSF
 2011-0286-01_2nd Fuller Dog Park 90 percent
 2011-0283-01_3rd Kennedy Dog Park 100 percent
 2011-0266-01 Vacation 1820 Scott Pl
 2011-0259-01_1st_Outside City of Glendale S Colorado Blvd and E Virginia Intersection
 2011-0250-01_2nd_Erosion Control Section 208 Technical Specification 95 percent
 2011-0240-04 Easement Relinquishment Tamarac Square Target
 2011-0236-01 MEP 1 Elm St
 2011-0226-01_3rd_SHE 2010-Traffic Signal Upgrade_100 percent
 2011-0226-01_2nd_SHE 2010 Traffic Signal Upgrade FOR
 2011-0219-01_3rd CDOT S Monaco and Leetsdale Dr Final Plans and Specs Outside Agency 100 Percent
 2011-0219-01_2nd CDOT S Monaco and Leetsdale Dr Intersection Improvement FOR
 2011-0218-01_2nd_Traffic Signal Improvements TSSIP1 100 percent
 2011-0213-01_3rd 29th Ave and CPB Intersection Improvements 100 percent
 2011-0213-01_2nd 29th Ave and CPB Intersection Improvements 95 Percent
 2011-0213-01_1st 29th and CPB Intersection Improvements 60 percent
 2011-0209-06 Easement Relinquishment GVR 57 2nd submittal
 2011-0209-06 Easement Relinquishment GVR 57 1st submittal
 2011-0205-01 Dedication
 2011-0204-01_3rd_Aztlan Playground 100 percent
 2011-0182-04 Vacation 1057 Sheridan Blvd
 2011-0104-21_8th NWES1D 100 percent roads around the CRMF
 2011-0104-21_7th NWES1 Final Geotech Reports
 2011-0104-21_6th NWES1A South Platte River Bridge IFC
 2011-0104-21_5th NWES1 IFC
 2011-0104-18_1st MEP Argo Substation Raceway W 44th Ave and Jason
 2011-0104-14_1st MEP Inca Pedestrian Bridge
 2011-0104-14-01_2nd MEP Inca Pedestrian Bridge
 2011-0104-05_4th PUC Application 48th Ave
 2011-0104-05_3rd EAGLE P3 PUC Application South Platte River Trail Grade Separated Crossing
 2011-0104-05_2nd EAGLE P3 PUC Application I-25 Grade Separated Crossing
 2011-0104-05_1st Eagle P3 PUC Application W 38th Ave Grade Separated Crossing
 2011-0104-04_4th Eagle P3 NWES 1 Civil Drainage Fox St Outfall
 2011-0103-22_2nd EC3E Early Grading and Drainage 1 and 2 100 percent
 2011-0103-22_1st EC3E Early Grading and Drainage package 3
 2011-0103-21_9th EC3E Early Foundations 100 percent
 2011-0103-21_8th EC3E 60 percent
 2011-0103-21_7th EC 3 30 percent including grade separations
 2011-0103-21_6th EC 3 Approved for Construction AFC
 2011-0103-21_5th EAGLE P3 EC 3B Design Pena Bridge 100 percent
 2011-0103-06_1st_PUC Application Grade Separations New Castle and Pena 100 percent
 2011-0103-04_2nd NWES 1C Fox St 72 inch Outfall IFC Design Submittal
 2011-0103-04_1st EC 3D 3rd Creek Tributary and DIA Parking Lot Structures 60 percent
 2011-0101-25 Peoria Street Railroad Grade Separation Project 30 percent
 2011-0101-21_9th EC1A IFC
 2011-0101-21_8th EC1R Conformed IFC
 2011-0101-21_7th EC1A 100 percent Columbine to Peoria
 2011-0101-21_6th EC1A 100 percent 38th to Columbine
 2011-0101-14_1st MEP Colorado Blvd Retaining Wall
 2011-0101-06_4th PUC Application Havana Street
 2011-0101-06_3rd PUC Application Ulster Street
 2011-0101-06_2nd PUC Application Gold Line under I-70
 2011-0101-06_1st Eagle P3 PUC Appl 38th St Grade Separated Pedestrian Crossing
 2011-0101-05_12th Eagle P3 PUC Application Central Park Grade separated Crossing
 2011-0101-04_5th EC 1D Design Package REVISED Coors Field IFC
 2011-0101-02_2nd Eagle P3 EC 1 41st and York Signal Warrant Tech Memo
 2011-0100-22_6th Eagle P3 Technicial Specifications IFC
 2011-0100-22_5th Eagle P3 MSE Wall Aesthetics
 2011-0100-21_5th Traction Electrification Design Documentation Substation Civil and Electrical
 2011-0100-17_1st Vacation 44th and Jason
 2011-0100-04_3rd 40th Ave Lowering Final Plans
 2011-0100-03_4th Eagle P3 CDOT Class 1 Separation Geotextile Mirafi 600X
 2011-0011_01_Colfax-Speer_Arapahoe_Utility Rev
 2011-0002-74_UR-56th and Havana
 2011-0002-20 Xcel Evans and Platte River 2nd submittal
 2011-0002-20 Xcel Evans and Platte River
 2011-0001-42 PRIVATE CenturyLink
 2011-0001-25_Qwest
 2010-0534-01_1st_UDFCD Waterways Master SWMP Draft_60 percent
 2010-0532-02_Encumbrance_Walnut St
 2010-0517-01_3rd_High St Outfall and 40th Ave System-Ph 1 Storm 95 percent
 2010-0517-01_2nd_High St Outfall and 40th Ave System-Ph 1 Storm 60 percent
 2010-0512-05 MEP
 2010-0510-06 Vacation McDonalds 4020 W Colfax
 2010-0505-01_2nd CDOT Region 6 Raised Medians TEP FOR
 2010-0505-01_1st_CDOT Region 6 Raised Medians TEP FIR
 2010-0481-08 MEP Revocation Exempla St. Joseph
 2010-0474-02_Easement Relinquishment
 2010-0467-01_4th_Martin Luther King Roadway Connection in Stapleton 100 percent
 2010-0467-01_3rd Martin Luther King Roadway Connection in Stapleton 95 percent
 2010-0465-01_1st_Cherry Creek Stabilization Plan Update 60 percent
 2010-0456-01_2nd Kennedy Ball Fields Detention Rehabiliation 95 percent
 2010-0448-01_1st_South Forest St Outfall 60 Percent
 2010-0447-02_MEP 1475 Lawrence st
 2010-0446-01_2nd Cherry Creek Street and Drainage Improvement CPEP 95 Percent
 2010-0444-01_2nd Bear Creek Pedestrian Bridge CPEP 100 percent
 2010-0436-06 GreenHouse Phase 2 and 3 Temp MEP 2nd Submittal
 2010-0436-06 GreenHouse Phase 2 and 3 Temp MEP 1st Submittal
 2010-0422-05 Easement Relinquishment Highpointe Residences
 2010-0408-01_7th Colorado Center Bike-Ped Bridge_Parks 95 Percent
 2010-0408-01_6th_Colorado Center Bike-Ped Bridge_90 percent
 2010-0376-02 Fox St Vacation
 2010-0352-01_1st_Central Denver Rec Interim Use 100 percent
 2010-0340-01_1st_Federal Aid Project No BR 2854-113 TEP FOR
 2010-0335-02 Easement Relinquishment
 2010-0333-01 3rd submittal
 2010-0333-01 2nd submittal
 2010-0324-01_4th Asbury Outfall CPEP 100 percent
 2010-0264-02 MEP Colorado National Bank 918 17th St
 2010-0247-01 Vacation
 2009-0624-02_2nd_CDOT US 6th and Sheridan Bridge Replacement TEP 100 Percent
 2009-0624-02-1st_CDOT US 6th and Sheridan Bridge Replacement TEP FOR
 2009-0623-02_1st Denver Water Waterline - Conduit No 302 Outside Agency Utility 30 Percent
 2009-0617-01 9th submittal MEP Bike Sharing
 2009-0617-01 8th submittal MEP Bike Sharing
 2009-0617-01 11th submittal MEP Bike Sharing
 2009-0617-01 10th submittal MEP Bike Sharing
 2009-0603-02_3rd DeBoer Pk Playground Rehab
 2009-0601-02_3rd_Bezoff Park Playground Rehab 100 percent
 2009-0601-02_2nd_Bezoff_Park_Playground_Rehab_95percent
 2009-0576-01_5th_14th St Market St to Colfax Ave Post Final Review Submittal
 2009-0576-01_4th_14th_St_Market_St_to_Colfax_Ave
 2009-0524-09_MEP_Dahlia Square 35th and Dahlia
 2009-0523-01_4th_Larimer Reconstruction 15th to 17th TEP 100 percent
 2009-0484-03 MEP Denver County Club
 2009-0351-07_1st_TREX Finalization Nassau Ave- Yosemite and Boston Final 95 percent
 2009-0351-06_2nd_TREX Finalization Boston Nassau and Lehigh 100 Percent
 2009-0351-06_1st TREX Finalization - Boston 95 percent
 2009-0255-02 Dedication 501 Fairmount Dr
 2009-0218-04 MEP
 2009-0195-04_1st_Federal Blvd_US 6 Imprvmts
 2009-0195-02_2nd_Federal Blvd US 6 interchange Improvements Drainage Final 95 percent
 2009-0186-06 Vacation
 2009-0059-35_1st_CPB Connections Signal and Field Revisions 100 percent
 2009-0059-34_1st_PCO Connections Phase 1.5 Storm 60 percent
 2009-0059-33_1st_CPB Connections Phase 2 Bridge over Sand Creek-Railroad-Smith Road 60 percent
 2009-0059-32_2nd_CBP Connections Phase 2 Storm 95 percent
 2009-0059-32_1st_CPB Connections Phase 2 Storm 36th to Northfield 40 percent
 2009-0059-31_2nd CPB Connections Phase 2 Outside Trans Plan 95 percent
 2009-0059-31_1st_CPB Connections Phase 2 Outside Trans plan 60 percent
 2009-0059-30_1st_CPB Connections-Stapleton Dist IV Phase 2 Storm Outfall 40 percent
 2009-0059-29_2nd_CPB Connections Phase 2 Sanitary 95 percent
 2009-0059-29_1st CPB Connections Sanitary phase 2 60 percent
 2009-0059-27 CBP Connections X Landscaping 40 percent
 2009-0059-26_1st_CPB Connections Storm-Sanitary Phase 1.5-100 percent
 2009-0059-25_3rd_CPB Connections, TEP Phase 1.5 100 Percent
 2009-0059-25_2nd_CPB Connections TEP, landscape Phase 1.5 95 percent
 2009-0059-24_2nd_CPB Connections Stormwater 100 percent
 2009-0059-24_1st_CPB Stormwater plan 100 percent Phase 1
 2009-0059-23_2nd_CPB Connections Sanitary Sewer 100 percent final
 2009-0059-23_1st_CPB Sanitary Sewer 95 percent phase 1
 2009-0059-20_6th CPB Connections over Sand Creek X Bridge Riprap 100 percent
 2009-0059-20_5th_CPB Connections Bridge over Sand Creek UPRR Smith Rd 100 percent
 2009-0059-18_3rd_CPB Connection TEP and Dry Utilities 100 percent
 2009-0059-18_2nd_CPB Phase 1 TEP Dry Utilities 95 percent
 2009-0059-03_4th_ CPB Connections TIS 36th to Northfield Corridor 95 percent
 2009-0059-03_3rd_CPB_Connections_36th_to_Northfield_Corridor
 2009-0034-03_5th_Additional Review_Curb and Gutter-Quebec
 2008-0555-04_2nd_Drainage and Hydraulics
 2008-0555-04_1st_Drainage Report
 2008-0555-02_2nd_I-25 SB 15th-20th-Speer Blvd-Central St_FOR PLAN
 2008-0555-02_1st_I-25 SB 15th-20th-Speer Blvd -Central St
 2008-0514-07 Vacation
 2008-0485-08_Easement relinquishment
 2008-0485-08_2nd submittal E.R
 2008-0297-04_6th CDOT I 25 - Bronco Arch Bridge Replacement TEP 100 Percent
 2008-0210-07 Easement Relinquishment
 2008-0091-01
 2008-0090-09_Easement_Relinquishment
 2007-0569-10
 2007-0477-02
 2007-0449-06
 2007-0375-02_VACATION
 2007-0294-02_2nd 19th and Chestnut Traffic Signals 60 percent
 2007-0243-01 South Platte River Zuni-Sun Valley Reach CPEP 100 percent
 2006-0481-02
 2006-0481-01
 2006-0274-33
 2006-0203-35_3rd_CPB Interchange I-270 Extensions RFR
 2006-0203-35_2nd_CPB Interchange I-270 Extensions FOR
 2006-0203-34_2nd_CPB Interchange Landscape and irrigation 100 percent
 2006-0203-34_1st_CPB Interchange Landscape Plans FOR
 2006-0203-31_2nd CPB Interchange Traffic Control Plans 100 percent FINAL
 2006-0203-31_1st_CPB Interchange Traffic Control Plans FOR
 2006-0203-25_3rd_CPB Interchange NDC Bridge and Aesthetics 100 percent
 2006-0203-25_2nd_CPB Interchange Bridge and Aesthetics Final 100 Percent
 2006-0203-25_1st_CPB Interchange Bridge and Aesthetics 90 percent
 2006-0203-23_2nd CPB Interchange Paving package 100 percent
 2006-0203-23_1st_CPB Interchange FOR Paving Package 95 percent
 2006-0203-22_1st_CPB FOR Ramp B-2 Bridge 95 percent
 2006-0203-20_9th_CPB Interchange NDC Additional Signage
 2006-0203-20_8th_CPB Interchange NDC Signals and lighting
 2006-0203-20_5th CPB Interchange signing striping ITS and Signals 100 percent
 2006-0203-20_3rd_CPB Signals FOR 95 percent
 2006-0203-20_2nd_CPB Signing and Striping
 2006-0203-20_1st_CPB Lighting plan 90 percent
 2006-0203-19_2nd_CPB Ramp C Bridge Final 100 percent
 2006-0203-19_1st_CPB Ramp C Bridge FOR
 2006-0203-12_5th_CPB Interchange NDC Drainage Revisions
 2006-0203-12_3rd_I-70 at Central Park Blvd Interchange Design Build RFC 100 percent
 2005-0584-09_1st_Federal Blvd Widening from Alameda to 6th Ave Final 95 percent
 2004-0931-02_2nd_Minor Encumbrance Permit Reivisions 95 percent
 2004-0837-04_Federal Courthouse MEP-8-2011
 2004-0172-06
 2002-0356-02 Dedication of Washington St. & Ringsby Ct

BottomM