Public Works Plans Review Services Electronic Review

Electronic Review

This site is for use by review entities previously notified by the City and County of Denver of a electronic plan review opportunity.
The following links contain Project documents and are made available for authorized reviewing entities to review and submit comments. Updates will be posted as available, allowing applicants to obtain status on projects. Please click on the appropriate link below to access review documents for the corresponding Project Number

Folders:

 (Root)\

 20150813-RichBuckley-Miss Race
 2015-UTIL-0000311 CenturyLink USIC 695 Zuni St
 2015-UTIL-0000310 CenturyLink USIC 4650 W Iowa
 2015-UTIL-0000300 Comcast Sage 1801 Broadway St
 2015-UTIL-0000299 CenturyLink USIC 4350 W Gill Pl
 2015-UTIL-0000298 Comcast Sage 19451 E Maxwell Pl
 2015-UTIL-0000293 2nd - ATT TCA Sheridan Blvd and W 26th Ave
 2015-UTIL-0000290 CenturyLink USIC 905 S Decatur
 2015-UTIL-0000284 CenturyLink USIC 2335 S Federal Blvd
 2015-UTIL-0000283 CenturyLink USIC 3250 W Florida
 2015-UTIL-0000282 CenturyLink USIC S Josephine and E Asbury
 2015-UTIL-0000281 CenturyLink USIC 75 Stuart St
 2015-UTIL-0000277 Comcast Sage 1801 California St
 2015-UTIL-0000273 Zayo Power Engineers 6116 E Warren Ave
 2015-UTIL-0000270 Comcast Sage 1875 Lawrence St
 2015-UTIL-0000268 Comcast Sage 1600 Stout St
 2015-UTIL-0000263 Comcast Sage 1400 16th St
 2015-UTIL-0000255 CenturyLink USIC 315 Holly St
 2015-UTIL-0000254 CenturyLink USIC 75 N Vrain St
 2015-UTIL-0000249 CenturyLink USIC 1895 W Kentucky
 2015-UTIL-0000247 Xcel UC Synergetic E Alameda Ave and S Garfield St
 2015-UTIL-0000236 Zayo Power Engineers S Acoma St and W Florida Ave
 2015-UTIL-0000235 Zayo Power Engineers I270 and I70
 2015-UTIL-0000234 Comcast Sage 1730 Blake St
 2015-UTIL-0000192 Zayo Power Engineers 11th St and Auraria Pkwy
 2015-UTIL-0000189 Zayo Power Engineers Hwy 287 and W 37th Ave
 2015-UTIL-0000187 Zayo Power Engineers S Grant St and E Dakota Ave
 2015-UTIL-0000169 Zayo Power Engineers Irving St and W 14th Ave
 2015-UTIL-0000162 ATT TCA Sheridan Blvd and W 26th Ave
 2015-UTIL-0000137 ATT TCA 20th and Irving
 2015-UTIL-0000061 Zayo Power Engineers W Howard Pl and Morrison Rd
 2015-RELINQ-0000007 South Sloans Lake Easement Relinquishment
 2015-RELINQ-0000006 Great Divide Easement Relinquishment
 2015-RELINQ-0000004 26th and Alcott Easement Relinquishment
 2015-RELINQ-0000003 14th and Speer Apartments Easement Relinquishment
 2015-RELINQ-0000002 MSU Aerospace Easement Relinquishment
 2015-RELINQ-0000001 ER at 3540 E 41st Ave
 2015-ENCROACHMENT-0000028 Tier III 3734 Osage St
 2015-ENCROACHMENT-0000027 Tier III 32nd and Walnut Redevelopment
 2015-ENCROACHMENT-0000026 Tier II 2901 W 25th Ave
 2015-ENCROACHMENT-0000023 Tier III Denver Bike Sharing - 21st submittal
 2015-CIP-0000050 Lawrence Bikeway 95 percent
 2015-CIP-0000049 Arapahoe Bikeway 95 Percent
 2015-CIP-0000048 North Metro Stock Show Station - Traffic Impact Study 30 percent
 2015-CIP-0000047 Morrison Road Median Landscape Planting Plan 95 percent
 2015-CIP-0000046 Kennedy Ball Fields Outfall System Improvements Const Plan
 2015-CIP-0000045 Sullivan Gateway Rehabilitation 30 percent
 2015-CIP-0000044 4th and Gilpin Medians 60 percent
 2015-CIP-0000043 Brighton Blvd - 44th to Race 30 percent
 2015-CIP-0000042 Platte River Improvements Grant Frontier Park to Alameda Asbuilt
 2015-CIP-0000041 Goldsmith Gulch Trail Replacement 60 percent
 2015-CIP-0000040 40th Ave Sidewalks Jackson St to Steel St 60 percent
 2015-CIP-0000039 Pedestrian Improvements - Morrison Road 100 percent
 2015-CIP-0000038 Morrison Road Medians 95 percent
 2015-CIP-0000037 Stapleton District IV Phase 2 Outfall 100 percent
 2015-CIP-0000035 I 25 Santa Fe Alameda Interchange Phase 2.0 95 percent
 2015-CIP-0000034 Median Nose Ramp End Treatment 30 percent
 2015-CIP-0000033 Metro Wastewater - PAR 1250 Interceptor Rehab 2015 100 percent
 2015-CIP-0000032 Inca St. Bike Ped Bridge over 38th Underpass AsBuilt
 2015-CIP-0000031 33rd Street Outfall -31st and 36th Outfall project 100 percent
 2015-CIP-0000030 Goldsmith Gulch Trail Replacement 30 percent
 2015-CIP-0000027 Stapleton District IV Phase 2 Outfall 100 percent
 2015-CIP-0000026 Federal Mississippi Alley 60 percent
 2015-CIP-0000025 Morrison Road - Alameda Ave - Knox Ct - RAMP 1-42 95percent
 2015-CIP-0000023 Genesee Park Challenge Course Staging Area 30 percent
 2015-CIP-0000022 Genesee Park Bison Pasture Ped Bridge 30 percent
 2015-CIP-0000021 Asbury and Tejon and Westwood Basketball Court Replacements 60 percent
 2015-CIP-0000020 Brighton Blvd - 44th to Race -30 design 30 percent
 2015-CIP-0000018 2015 General Storm 95 percent
 2015-CIP-0000017 Water Quality Concept Plans
 2015-CIP-0000016 South Forest St Outfall 65 percent
 2015-CIP-0000015 Arapahoe Bikeway 60 Percent
 2015-CIP-0000014 Kennedy Ball Fields Outfall System Improvements 95 percent
 2015-CIP-0000013 Pedestrian Improvements - Morrison Road 95 percent
 2015-CIP-0000012 First Creek Restoration - Tower Rd to Pena Blvd 100 percent
 2015-CIP-0000011 Hampden Havana Pedestrian Safety Connections Concept
 2015-CIP-0000010 CDOT 19187 I-225 from I-25 to Yosemite Reconstruction
 2015-CIP-0000009 CDOT 19339 I-70 over Havana St Design-build Bridge Replace
 2015-CIP-0000008 Genesee Park Beaver Brook Trailhead 30 percent
 2015-CIP-0000007 Morrison Road Medians 30 percent
 2015-CIP-0000006 Platte River Vision Grant Frontier Park to Alameda - Schedule D AsBuilt
 2015-CIP-0000003 Genesee Park Bison Overlook 95 percent
 2015-CIP-0000002 Red Rocks Parking Lot and Intersection 95 percent
 2015-CIP-0000001 Environmental Learning for Kids -ELK- 30 percent
 2015-0345-01_1st 2016 General Storm Phase II 30 percent
 2015-0342-01_1st Lawrence Bikeway 60 percent
 2015-0341-01_1st Morrison Road Median Landscape Planting Plan 30 percent
 2015-0314-01 Tier II Encroach Z-Block Hotel
 2015-0313-01 Vacation for Cherry Creek Towers at 3100 E Cherry Creek S Dr
 2015-0310-01 Vacation at Belleview Station 2 - Quebec
 2015-0305-01_1st Brighton Boulevard 29th to 44th Street 30 Percent
 2015-0303-01_1st Goldsmith Gulch Trail Replacement Concept
 2015-0301-01_1st Brighton Blvd - 44th to Race - 30 design Concept
 2015-0299-01 Tier III Encroach 2660 Walnut St
 2015-0294-01 Vacation at 65 S Yuma St
 2015-0293-01 Vacation at 1718 King St
 2015-0292-01_1st Morrison Road conceptual lighting plan Concept
 2015-0291-01_1st 33rd and Hudson-Holly Urgent Const or AsBuilt
 2015-0241-01_1st_Storm Drain Water Quality Prioritization and Scorecard 30 percent
 2015-0235-01 Tier II The District
 2015-0234-01_1st_40th Ave North Sidewalk - Jackson St to Steele St Concept
 2015-0223-01 E.R. 1777 S Bellaire St
 2015-0222-02 Tier III Encroach 1001 Bannock Street
 2015-0208-01 Vacation at 2298 Clay St
 2015-0180-01_1st CDOT Region 1 Pre-Scoping Reports Concept
 2015-0178-01 Tier II EV Charging Station at Castle Marne
 2015-0176-01 Tier II Trolley Tracks Knox Court and W 6th Ave
 2015-0174-01 Tier III 2528 Walnut St
 2015-0169-02 Easement Relinquishment 2nd at Lionstone Filing 1
 2015-0169-01 Easement Relinquishment at Lionstone Filing 1
 2015-0166-01 Vacation at 2526 Julian St
 2015-0155-01_1st Tower Rd Widening from 80th Ave to S Pena Ramps by Commerce City 30 percent
 2015-0154-01_1st Denver Traffic Improvement Project 2014 0-95 percent
 2015-0152-01_1st DW - Colorado Blvd Main Replacement - Colfax to 26th 60 pcnt
 2015-0146-02_1st Bicycle Parking Rules and Regulations 95 percent
 2015-0146-01_1st Bicycle Parking Standards 95 percent
 2015-0138-01 Vacation at 1900 N Broadway
 2015-0132-01_1st Platte Valley Trolley Rehabilitation 95 percent
 2015-0128-01_2nd 10th and Perry Playground Replacement 100 percent
 2015-0128-01_1st 10th and Perry Playground Replacement 95 percent
 2015-0116-01_1st CDOT Structure Pre-Scoping Reports Concept
 2015-0094-01_1st Knox Court Bike Boulevard 30 percent
 2015-0093-01_2nd_Denver Water - Smith and Joliet 12 in Main Relocation 95 percent
 2015-0093-01_1st_Denver Water - Smith and Joliet 12 in Main Relocation 30 percent
 2015-0085-01_2nd_Metro Wastewater - PAR 1250 Interceptor Rehab 2015 60 percent
 2015-0085-01_1st_Metro Wastewater - PAR 1250 Interceptor Rehab 2015 30 percent
 2015-0070-02 Vacation at 2326 N Clay St
 2015-0069-01_2nd_RTD - Speer and Stout Lightrail Crossing Impr_60pcnt
 2015-0069-01_1st_RTD - Speer and Stout Lightrail Crossing Impr_30pcnt
 2015-0067-01 Vacation at Arroyo Village
 2015-0065-01 Tier III 1600 Downing St
 2015-0052-01_1st Kennedy Dog Park Improvements 30pcnt
 2015-0042-01 Vacation at 1800 S Bellaire
 2015-0040-01 Encroachment - City Gate
 2015-0037-01_3rd Denver Water 2015-2016 Vault Project 95 percent
 2015-0037-01_2nd Denver Water 2015-2016 Vault Project 60 percent
 2015-0024-01 17th and Platte
 2015-0013-06 Verizon - Zayo Group W Mississippi Ave & S Jason St
 2015-0012-03 Xcel Q3 Havana Ave and Smith Rd
 2015-0011-16_2nd CenturyLink USIC 985 Perry
 2015-0011-16_1st CenturyLink USIC 985 Perry
 2015-0011-06 CenturyLink USIC 1961 Dahlia
 2015-0011-03 CenturyLink USIC 2303 S Marion
 2015-0010-01 ATT General Dynamics 3610 Inca St
 2015-0004-01 Denver Water 2601 S Sheridan Blvd and 5601 E Iowa Ave
 2015 -UTIL-0000101 CenturyLink USIC 2103 S. Clermont
 2014-1126-01 Vacation at 2626 Lawrence St
 2014-1117-02 Vacation at 2329 N Eliot St Rear
 2014-1098-01_3rd 3rd and Hooker over Weir Gulch Rehabilitation 100 percent
 2014-1098-01_2nd 3rd and Hooker over Weir Gulch Rehabilitation
 2014-1096-01_2nd_2015 General Storm_60pct
 2014-1096-01_1st_2015 General Storm_30pct
 2014-1090-02_2nd DU - Asbury Roadway Improvements 60 percent
 2014-1090-02_1st DU - Asbury Roadway Improvements Concept
 2014-1079-01 Easement Relinquishments near 1073 S Broadway - Gates Rubber Redevelopment
 2014-1066-01_1st Morrison Road - Alameda Ave - Knox Ct - RAMP 1-42 30percent
 2014-1065-02 Easement Relinquishment at 2401 Blake
 2014-1055-01_1st_Ord. Change - Bicycle Restrictions on 16th St Mall
 2014-1052-01 Vacation at 3525 W 22nd Ave
 2014-1049-01 Vacation at 1060 S Meade St
 2014-1034-01_2nd Red Rocks Parking Lot and Intersection Project 60 percent
 2014-1033-01_1st Denver Pedestrian Improvements - Morrison Road 30percent
 2014-1026-01 MEP la Veracruzana 1130 S Federal Blvd
 2014-1021-01_1st_Colfax and Lipan - Intersection Improvements_90pcnt
 2014-1019-01_2nd_Denver Water 2015 Pipe Rehab_100 percent
 2014-1019-01_1st_Denver Water 2015 Pipe Rehab_30pcnt
 2014-1017-01_2nd_Denver Water Conduit 309 95 percent
 2014-1017-01_1ST_Denver Water Conduit 309_60Ppcnt
 2014-1014-01_1st Denver Water Conduit 70 90pcnt
 2014-1003-01_3rd National Western Center Master Plan
 2014-1003-01_2nd_National Western Center Master Plan
 2014-1003-01_1st_National Western Center Master Plan
 2014-0987-01_1st Sediment Control Structures on W. Mexico Avenue Concept
 2014-0984-01_2nd Babi Yar Tributary Improvement 95pcnt
 2014-0984-01_1st Babi Yar Tributary Improvement 30pcnt
 2014-0969-01 MEP RiNo Art District Signage
 2014-0956-01_2nd Renaissance Diversion Structure - South Platte River Concept
 2014-0956-01_1st Renaissance Diversion Structure - South Platte River-30percent
 2014-0946-01_1st Colfax and Lipan Intersection Improvements 60 percent
 2014-0932-02 MEP 2522 Hooker St
 2014-0917-01_3rd Green Infrastructure Details 95 percent
 2014-0917-01 _2nd Ultra-Urban Green Infrastructure Manual 60 percent
 2014-0897-01_1st_First Creek Trail_90pct
 2014-0896-01_1st_Sand Creek Re-use Outfall_30pct
 2014-0894-01_1st_Arapahoe County Dahlia St Improvements Dahlia to Vass 95 Percent
 2014-0884-01_1st MLK Bike Lanes uebec to CPB ramps
 2014-0878-01 MEP 1700 Humboldt
 2014-0870-01 Vacation at 1209 N Perry St
 2014-0867-01 Vacation at 695 Water St
 2014-0865-01_3rd_2014 Revision of PW Trans Standards and Details 95 percent
 2014-0865-01_2nd 2014 Revision of PW Trans Standards and Details 60pcnt
 2014-0858-01_2nd 2014 SHE-2015 FASTER Traffic Signal Upgrade 95percent
 2014-0858-01_1st 2014 SHE-2015 FASTER Traffic Signal Upgrade 95pcnt
 2014-0840-01_1st Jefferson Park Playground Renovation 100 Percent
 2014-0815-02_1st Central Denver Recreation Center 30pcnt
 2014-0814-01_1st_CDOT Bridge Rehab Replacement 95 Percent
 2014-0811-01_1st_Sunnyside Music Festival
 2014-0810-01_3rd Westerly Creek Channel Restoration Reach 3_100pcent
 2014-0810-01_2nd Westerly Creek Channel Restoration Reach 3_90pcent
 2014-0809-03 Vacation at 1233 Tennyson
 2014-0807-01_3rd_Berkeley North Tennis Courts_100percent
 2014-0807-01_2nd_Berkeley North Tennis Courts_100percent
 2014-0807-01_1st_Berkeley North Tennis Courts_90pcent parks plan
 2014-0804-01_2nd Mestizo-Curtis Park Playground Renovation 100pcnt
 2014-0804-01_1st_Mestizo-Curtis Park Playground Renovation 30 Percent
 2014-0801-01_1st Mill Levy Package 5-Traffic Signal Upgrade 95percent
 2014-0763-01_BuCu West Chile Fest
 2014-0761-01_2nd_1615 California St Sidewalk Stabilization
 2014-0761-01_1st_1615 California St Sidewalk Stabilization
 2014-0760-01_2nd_Denver Museum of Nature and Science West side Landscaping 100 percent
 2014-0760-01_1st_Denver Museum of Nature and Science West side Landscaping 95 Percent
 2014-0759-01_1st PW Vendors and Peddlers Policy 30percent
 2014-0756-01_6th Confluence of Westerly and Sand Creek 2nd 100 percent Package 1
 2014-0756-01_5th Confluence of Westerly and Sand Creek 100 percent Package 2
 2014-0756-01_4th Confluence of Westerly and Sand Creek 100 percent package 1
 2014-0737-01_2nd Genessee Mountain Park Challenge Course Improvements 95 Percent
 2014-0737-01_1st Genesee Mountain Park Challenge Course Improvements
 2014-0716-01_Cheesman Park Art Fest
 2014-0707-01_1st Jefferson Park Playground 75pcent
 2014-0706-01_4th Inca St Multi-Use Path and 38th Ave Underpass Improv_100pcnt
 2014-0706-01_3rd Inca St Multi-Use Path and 38th Ave Underpass Improvement
 2014-0688-02 Tier III Encroach 1875 Central
 2014-0655-01 MEP 326 S Broadway
 2014-0653-01_3rd MWRD Interceptor Rehabilitation 100 Percent
 2014-0653-01_2nd MWRD Interceptor Rehabilitation 95percent
 2014-0623-01_1st_Berkeley Lake Park tennis court replacement 100 Percent
 2014-0616-01_1st_Intersection Safety Cultural Center Complex Garage Construction 95 Percent
 2014-0614-01_Denver Water 1537A Main Replacement at 8th and S Platte River 30 Percent
 2014-0614-01_2nd Denver Water 1537A Main Replacement at 8th and S Platte River 95 Percent
 2014-0610-06 2nd Submittal MEP 1144 15th St
 2014-0610-06 1st submittal MEP 1144 15th St
 2014-0610-05 Easement Relinquishment at 1144 15th St
 2014-0602-01_1st_Federal Blvd EA Tech Memo Water Quality (7th to Howard)
 2014-0597-07 Easement Relinquishment at 9th and Colorado
 2014-0586-01_2nd RTD - 16th Street Realignment at Market Street Station 100pcent
 2014-0586-01_1st RTD - 16th Street Realignment at Market Street Station 60pcent
 2014-0584-01_2nd Encroachments in the Public Right of Way 95 Percent
 2014-0584-01_1st PW Major Encroachment Process 30percent
 2014-0581-04 Partial Alley Vacation at 3300 E 1st Ave
 2014-0571-01_2nd_Little Box Car Enhanced Streetscape and Dog Run 95 percent
 2014-0571-01_1st_Little Box Car Enhanced Streetscape and Dog Run 60 percent
 2014-0560-01_1st_Harvard Gulch Walk Replacement 2014
 2014-0550-01_2nd 20th and Chestnut Parking Lot 100 percent
 2014-0550-01_1st 20th and Chestnut Parking Lot 95percent
 2014-0496-01_1st_Country Club Neighborhood Median Islands_30 pcent
 2014-0494-01_2nd_Bear Creek Trail Replacement at Sheridan Blvd 100pcent
 2014-0494-01_1st_Bear Creek Trail Replacement at Sheridan Blvd 60 percent
 2014-0486-08_1st INTERSECTION SAFETY PROJECT_2014_Morrison and Perry Signal_Urgent Final
 2014-0486-07_1st INTERSECTION SAFETY PROJECT 2014 30th and Downing Urgent Final
 2014-0486-05_1st INTERSECTION SAFETY PROJECT 2014 30th and Pecos Urgent Final
 2014-0486-04_1st Intersection Safety Project 13th and Holly 112 E 45th Final Plan
 2014-0486-03_2nd INTERSECTION SAFETY PROJECT 2014 Cherry Creek and Kentucky Ave 100 percent
 2014-0486-03_1st INTERSECTION SAFETY PROJECT 2014 Cherry Creek S Dr and Kentucky Ave
 2014-0482-01_3rd_NB University over Cherry Crk Bridge Rehab D-01-cc-281 100 Percent
 2014-0482-01_2nd_NB University over Cherry Crk Bridge Rehab D-01-CC-281 95prct
 2014-0480-01_1st 18th St two way conversion Wynkoop to Blake 60percent
 2014-0433-01_4th_General Storm 100 Percent
 2014-0083-01_2nd_CDOT 19671-SH121 Wadsworth from Park Hill to Dartmouth
 2014-0083-01_1ST_CDOT 19671 - SH121 Wadsworth from Park Hill to Dartmouth
 2014-0080-01_1st_City Park Museum Road Phase 3C
 2014-0079-01_3rd_Cherry Creek South Drive Phase 3-Steele to Garfield 100percent
 2014-0079-01_2nd_Cherry Creek South Drive Phase 3-Steele to Garfield 60percent
 2014-0078-03 Easement Relinquishment at 4200 W Conejos Ave
 2014-0067-01_5th Stapleton Northfield Campus 100pcnt
 2014-0067-01_4th Stapleton Northfield Campus 100pcnt
 2014-0065-01_2nd_BNSF Bridge 540.09 over South Platte River Replacement 100 Percent
 2014-0061-04 Vacation at 55 S Zuni St
 2014-0051-19_Dedication W. Floyd Ave and S. Ingalls
 2014-0051-17 Dedication Public Alley between 25th 26th and Irving Julian
 2014-0038-05 Easement Relinquishment Two near 6950 E Chenango Ave
 2014-0019-03_Teleport RMWT 2242 Stout
 2013-0607-01_3rd_Triangle Park Improvements 100 Percent
 2013-0607-01_2nd_Triangle Park Improvements 95percent
 2013-0604-01_3rd Denver Water Vault Modifications 95 Percent
 2013-0604-01_2nd Denver Water Vault Modifications_60pcent
 2013-0603-06 Jefferson Park Apartments Tier II 27th and Decatur
 2013-0585-02 Easement Relinquishment at 3124 W 20th Ave
 2013-0577-02 Vacation at 3600 E Alameda
 2013-0548-02 Easement Relinquishment W 28th Ave and Vallejo St
 2013-0514-04 Easement Relinquishment 4880 Federal
 2013-0462-02 Vacation at 195 S Monaco
 2013-0447-01_3rd CDOT US-40 Colfax Clarkson-Colorado 95pcnt
 2013-0447-01_2nd CDOT US-40 Clarkson-Colorado 95percent
 2013-0385-01_3rd_Mill Levy Package 4 95percent
 2013-0373-01_3rd First Creek Restoration - Tower Rd to Pena Blvd 100 percent
 2013-0364-01_3rd Denver Water 15143A - Conduit No. 74 Relocation 100percent
 2013-0351-01_2nd City Park Pavilion Parking Lot Renovation 100 percent
 2013-0226-13_5th_Stapleton Filing 45-P-10 100pcent
 2013-0226-13_4th_Stapleton Filing 45-P-10 100 Percent
 2013-0122-02 Easement Relinquishment at 2980 Huron St
 2013-0044-03_1st Platte River Improvements Schedule C Pasquinels Landing Park 100pcnt
 2013-0044-02_1st Platte River Improvements Grant-Frontier to Alameda Sched B 100 Percent
 2013-0044-01_6th_Drainage Report_Platte River Improvements Grant Frontier to Alameda Final
 2013-0044-01_5th Platte River Improvements Grant Frontier to Alameda Final
 2012-0515-04 Vacation at Yale Station
 2012-0425-01_3rd_Denver Water C14421A 2013 Pipe Rehabilitation Project_95 Percent
 2012-0413-05 Easement Relinquishment at Boulevard One
 2012-0381-02_1st_Platte Farm Open Space
 2012-0350-01_1st Vacation 740-744 Hazel Ct
 2012-0214-02_1st 33rd Street Outfall -31st and 36th Street Outfall Project 95 percent
 2012-0163-02_1st South Jason Street Parks Maintenace Facility 95 percent
 2012-0030-04_4th_ CDOT US 6 Bridges -Civil 90 Percent Drainage and Stuctures 100 Percent
 2012-0030-03_9th_Parks CDOT 18838 - Phase III Plate River Trail 60percent
 2012-0030-03_6th_Parks CDOT 18838 Phase II US Bridges Project
 2012-0024-01_3rd_Parks Revised Construction Specifications 95 percent
 2011-0622-01_5th_RTD Downtown Denver Circulator 60 Percent
 2011-0571-03_4th Dakota Outfall Phase 2 final 100percent
 2011-0489-02_5th 16th St Mall Reconstruction 100pcnt
 2011-0489-02_4th 16th St Mall Reconstruction 90pcnt
 2011-0489-02_3rd 16th St Mall Reconstruction 60pcent
 2011-0477-04 Tier III Encroach Bike Station
 2011-0426-01_6th Hampden Heights Storm Sewer Phase III-Urgent Const
 2011-0426-01_5th Hampden Heights Storm Sewer Phase III-100 percent
 2011-0364-03_2nd Federal Blvd from 5th Ave to Howard Place 95 percent
 2010-0448-01_3rd South Forest St Outfall 2nd 95percent
 2010-0446-06_1st Cherry Creek St and Drainage Improvements Drainage Report 95pcnt
 2010-0446-04_2nd_North University Outfall CNN Phase II 100 Percent
 2010-0446-04_1st_North University Outfall CCN - Phase II -5 Percent
 2010-0217-03_Dedication Quincy and Pierce
 2009-0617-01_20th Denver Bike Sharing
 2009-0424-02 Vacation at Lakewood Gulch Park
 2009-0066-09_1st_I-25 Santa Fe Interchange Water Quality and DrainageFinal Reports
 2009-0066-08_3rd I-25 and Santa Fe Construction Bid Plans and Specs 100 Percent
 2009-0066-08_2nd_-25 Santa Fe Drive Construction Bid Plans and Specs 100 Percent
 2009-0059-31_6th_CPB Connections Phase 2 Outside Trans Plan 100 percent
 2009-0059-30_5th_CPB Connections-Stapleton Dist IV Phase 2 Storm Outfall 100 percent
 2007-0522-05_1st DUS-North Metro Rail Line Area A-C Wet Utilities 60pcnt
 2007-0522-04_1st DUS-North Metro Rail Line South Platte River Bridge CLOMR 60pcnt
 2007-0522-03_1st DUS-North Metro Rail Line Area A through C Bridge Structures 60pcnt
 2007-0522-02_3rd DUS-North Metro Rail Line Area A through C 90percent
 2007-0522-02_2nd DUS-North Metro Rail Line Area A through C 60percent
 2007-0522-02_1st- DUS-North Metro Rail Line Tie In

Feedback