Public Works Plans Review Services Electronic Review

Electronic Review

This site is for use by review entities previously notified by the City and County of Denver of a electronic plan review opportunity.
The following links contain Project documents and are made available for authorized reviewing entities to review and submit comments. Updates will be posted as available, allowing applicants to obtain status on projects. Please click on the appropriate link below to access review documents for the corresponding Project Number

Folders:

 (Root)\

 2015-0234-01_1st_40th Ave North Sidewalk - Jackson St to Steele St Concept
 2015-0223-01 1777 S Bellaire St
 2015-0208-01 Vacation at 2298 Clay St
 2015-0180-01_1st CDOT Region 1 Pre-Scoping Reports Concept
 2015-0178-01 Tier II EV Charging Station at Castle Marne
 2015-0176-01 Tier II Trolley Tracks Knox Court and W 6th Ave
 2015-0174-01 Tier III 2528 Walnut St
 2015-0169-02 Easement Relinquishment 2nd at Lionstone Filing 1
 2015-0169-01 Easement Relinquishment at Lionstone Filing 1
 2015-0166-01 Vacation at 2526 Julian St
 2015-0155-01_1st Tower Rd Widening from 80th Ave to S Pena Ramps by Commerce City 30 percent
 2015-0154-01_1st Denver Traffic Improvement Project 2014 0-95 percent
 2015-0152-01_1st DW - Colorado Blvd Main Replacement - Colfax to 26th 60 pcnt
 2015-0146-02_1st Bicycle Parking Rules and Regulations 95 percent
 2015-0146-01_1st Bicycle Parking Standards 95 percent
 2015-0138-01 Vacation at 1900 N Broadway
 2015-0132-01_1st Platte Valley Trolley Rehabilitation 95 percent
 2015-0128-01_1st 10th and Perry Playground Replacement 95 percent
 2015-0116-01_1st CDOT Structure Pre-Scoping Reports Concept
 2015-0112-01 Magellan Gas Pipeline Utility Relocation 56th Ave and east of Valentia St
 2015-0094-01_1st Knox Court Bike Boulevard 30 percent
 2015-0093-01_2nd_Denver Water - Smith and Joliet 12 in Main Relocation 95 percent
 2015-0093-01_1st_Denver Water - Smith and Joliet 12 in Main Relocation 30 percent
 2015-0085-01_1st_Metro Wastewater - PAR 1250 Interceptor Rehab 2015 30 percent
 2015-0070-02 Vacation at 2326 N Clay St
 2015-0069-01_2nd_RTD - Speer and Stout Lightrail Crossing Impr_60pcnt
 2015-0069-01_1st_RTD - Speer and Stout Lightrail Crossing Impr_30pcnt
 2015-0067-01 Vacation at Arroyo Village
 2015-0065-01 Tier III 1600 Downing St
 2015-0052-01_1st Kennedy Dog Park Improvements 30pcnt
 2015-0042-01 Vacation at 1800 S Bellaire
 2015-0040-01 Encroachment - City Gate
 2015-0037-01_2nd Denver Water 2015-2016 Vault Project 60 percent
 2015-0037-01_1st Denver Water 2015-2016 Vault Project 30pcnt
 2015-0024-01 17th and Platte
 2015-0012-09 Xcel Q3 PSCo 48th and Vasquez
 2015-0012-03 Xcel Q3 Havana Ave and Smith Rd
 2015-0011-42 CenturyLink USIC 3379 W 37th
 2015-0011-41 CenturyLink USIC W Wesley Ave and S Platte River Rd
 2015-0011-40 CenturyLink USIC 114 S Downing St
 2015-0011-39 CenturyLink USIC 398 S Jasmine
 2015-0011-38 CenturyLink USIC 3497 Dahlia
 2015-0011-37 CenturyLink USIC 6052 E 33rd Ave
 2015-0011-36 CenturyLink USIC 2197 Lowell Blvd
 2015-0011-35 CenturyLink USIC 746 Jasmine St
 2015-0011-34 CenturyLink USIC 1 S Dahlia
 2015-0011-33 CenturyLink USIC 5351 E 16th Ave
 2015-0011-32 CenturyLink USIC 2345 W 42nd
 2015-0011-16 CenturyLink USIC 985 Perry
 2015-0011-06 CenturyLink USIC 1961 Dahlia
 2015-0011-03 CenturyLink USIC 2303 S Marion
 2015-0010-03 ATT TCA 3431 Windsor Dr
 2015-0010-01 ATT General Dynamics 3610 Inca St
 2015-0004-01 Denver Water 2601 S Sheridan Blvd and 5601 E Iowa Ave
 2015-0003-08 Comcast Sage 7001 Yampa St
 2015-0003-07 Comcast Sage 1040 Tennyson St
 2015-0003-06 Comcast Sage 1400 Glenarm Pl
 2014-1126-01 Vacation at 2626 Lawrence St
 2014-1117-02 Vacation at 2329 N Eliot St Rear
 2014-1098-01_2nd 3rd and Hooker over Weir Gulch Rehabilitation
 2014-1098-01_1st 3rd and Hooker over Weir Gulch Rehabilitation Concept
 2014-1096-01_2nd_2015 General Storm_60pct
 2014-1096-01_1st_2015 General Storm_30pct
 2014-1090-02_1st DU - Asbury Roadway Improvements Concept
 2014-1079-01 Easement Relinquishments near 1073 S Broadway - Gates Rubber Redevelopment
 2014-1066-01_1st Morrison Road - Alameda Ave - Knox Ct - RAMP 1-42 30percent
 2014-1065-02 Easement Relinquishment at 2401 Blake
 2014-1055-01_1st_Ord. Change - Bicycle Restrictions on 16th St Mall
 2014-1052-01 Vacation at 3525 W 22nd Ave
 2014-1049-01 Vacation at 1060 S Meade St
 2014-1034-01_2nd Red Rocks Parking Lot and Intersection Project 60 percent
 2014-1034-01_1st Red Rocks Parking Lot and Intersection Concept
 2014-1033-01_1st Denver Pedestrian Improvements - Morrison Road 30percent
 2014-1026-01 MEP la Veracruzana 1130 S Federal Blvd
 2014-1021-01_1st_Colfax and Lipan - Intersection Improvements_90pcnt
 2014-1020-01_2nd 2015 Annual Sanitary Sewer Improvements-Lining 100pcnt
 2014-1020-01_1st_2015 Annual Sanitary Sewer Improvements-Lining_95pcnt
 2014-1019-01_2nd_Denver Water 2015 Pipe Rehab_100 percent
 2014-1019-01_1st_Denver Water 2015 Pipe Rehab_30pcnt
 2014-1017-01_1ST_Denver Water Conduit 309_60Ppcnt
 2014-1014-01_1st Denver Water Conduit 70 90pcnt
 2014-1003-01_3rd National Western Center Master Plan
 2014-1003-01_2nd_National Western Center Master Plan
 2014-1003-01_1st_National Western Center Master Plan
 2014-0987-01_1st Sediment Control Structures on W. Mexico Avenue Concept
 2014-0984-01_2nd Babi Yar Tributary Improvement 95pcnt
 2014-0984-01_1st Babi Yar Tributary Improvement 30pcnt
 2014-0969-01 MEP RiNo Art District Signage
 2014-0956-01_1st Renaissance Diversion Structure - South Platte River-30percent
 2014-0954-01_3rd 16th and Broadway Intersection Improvements 95 percent
 2014-0954-01_2nd 16th and Broadway Intersection Improvements 60 percent
 2014-0946-01_1st Colfax and Lipan Intersection Improvements 60 percent
 2014-0932-02 MEP 2522 Hooker St
 2014-0917-01 _2nd Ultra-Urban Green Infrastructure Manual 60 percent
 2014-0917-01 _1st Green Infrastructure Details 30 percent
 2014-0897-01_1st_First Creek Trail_90pct
 2014-0896-01_1st_Sand Creek Re-use Outfall_30pct
 2014-0894-01_1st_Arapahoe County Dahlia St Improvements Dahlia to Vass 95 Percent
 2014-0884-01_1st MLK Bike Lanes uebec to CPB ramps
 2014-0878-01 MEP 1700 Humboldt
 2014-0870-01 Vacation at 1209 N Perry St
 2014-0867-01 Vacation at 695 Water St
 2014-0865-01_3rd_2014 Revision of PW Trans Standards and Details 95 percent
 2014-0865-01_2nd 2014 Revision of PW Trans Standards and Details 60pcnt
 2014-0858-01_2nd 2014 SHE-2015 FASTER Traffic Signal Upgrade 95percent
 2014-0858-01_1st 2014 SHE-2015 FASTER Traffic Signal Upgrade 95pcnt
 2014-0840-01_1st Jefferson Park Playground Renovation 100 Percent
 2014-0815-02_1st Central Denver Recreation Center 30pcnt
 2014-0814-01_1st_CDOT Bridge Rehab Replacement 95 Percent
 2014-0811-01_1st_Sunnyside Music Festival
 2014-0810-01_3rd Westerly Creek Channel Restoration Reach 3_100pcent
 2014-0810-01_2nd Westerly Creek Channel Restoration Reach 3_90pcent
 2014-0809-03 Vacation at 1233 Tennyson
 2014-0807-01_3rd_Berkeley North Tennis Courts_100percent
 2014-0807-01_2nd_Berkeley North Tennis Courts_100percent
 2014-0807-01_1st_Berkeley North Tennis Courts_90pcent parks plan
 2014-0804-01_2nd Mestizo-Curtis Park Playground Renovation 100pcnt
 2014-0804-01_1st_Mestizo-Curtis Park Playground Renovation 30 Percent
 2014-0801-01_1st Mill Levy Package 5-Traffic Signal Upgrade 95percent
 2014-0763-01_BuCu West Chile Fest
 2014-0761-01_2nd_1615 California St Sidewalk Stabilization
 2014-0761-01_1st_1615 California St Sidewalk Stabilization
 2014-0760-01_2nd_Denver Museum of Nature and Science West side Landscaping 100 percent
 2014-0760-01_1st_Denver Museum of Nature and Science West side Landscaping 95 Percent
 2014-0759-01_1st PW Vendors and Peddlers Policy 30percent
 2014-0756-01_6th Confluence of Westerly and Sand Creek 2nd 100 percent Package 1
 2014-0756-01_5th Confluence of Westerly and Sand Creek 100 percent Package 2
 2014-0756-01_4th Confluence of Westerly and Sand Creek 100 percent package 1
 2014-0737-01_2nd Genessee Mountain Park Challenge Course Improvements 95 Percent
 2014-0737-01_1st Genesee Mountain Park Challenge Course Improvements
 2014-0716-01_Cheesman Park Art Fest
 2014-0707-01_1st Jefferson Park Playground 75pcent
 2014-0706-01_4th Inca St Multi-Use Path and 38th Ave Underpass Improv_100pcnt
 2014-0706-01_3rd Inca St Multi-Use Path and 38th Ave Underpass Improvement
 2014-0655-01 MEP 326 S Broadway
 2014-0653-01_3rd MWRD Interceptor Rehabilitation 100 Percent
 2014-0653-01_2nd MWRD Interceptor Rehabilitation 95percent
 2014-0623-01_1st_Berkeley Lake Park tennis court replacement 100 Percent
 2014-0616-01_1st_Intersection Safety Cultural Center Complex Garage Construction 95 Percent
 2014-0614-01_Denver Water 1537A Main Replacement at 8th and S Platte River 30 Percent
 2014-0614-01_2nd Denver Water 1537A Main Replacement at 8th and S Platte River 95 Percent
 2014-0610-06 2nd Submittal MEP 1144 15th St
 2014-0610-06 1st submittal MEP 1144 15th St
 2014-0610-05 Easement Relinquishment at 1144 15th St
 2014-0602-01_1st_Federal Blvd EA Tech Memo Water Quality (7th to Howard)
 2014-0597-07 Easement Relinquishment at 9th and Colorado
 2014-0586-01_2nd RTD - 16th Street Realignment at Market Street Station 100pcent
 2014-0586-01_1st RTD - 16th Street Realignment at Market Street Station 60pcent
 2014-0584-01_2nd Encroachments in the Public Right of Way 95 Percent
 2014-0584-01_1st PW Major Encroachment Process 30percent
 2014-0581-04 Partial Alley Vacation at 3300 E 1st Ave
 2014-0571-01_2nd_Little Box Car Enhanced Streetscape and Dog Run 95 percent
 2014-0571-01_1st_Little Box Car Enhanced Streetscape and Dog Run 60 percent
 2014-0560-01_1st_Harvard Gulch Walk Replacement 2014
 2014-0550-01_2nd 20th and Chestnut Parking Lot 100 percent
 2014-0550-01_1st 20th and Chestnut Parking Lot 95percent
 2014-0546-01_4th Washington Park Downing St Irrigation Improvements 100 percent
 2014-0546-01_3rd Washington Park Downing St Irrigation Improvements 95percent
 2014-0540-01_2nd Denver Traffic Improvement Project 2013
 2014-0540-01_1st_Denver Traffic Improvement Project 2013
 2014-0533-01_3rd_Denver TSSIP 2013-2014 100 Percent
 2014-0533-01_2nd_Denver TSSIP 2013-2014 100 Percent
 2014-0496-01_1st_Country Club Neighborhood Median Islands_30 pcent
 2014-0494-01_2nd_Bear Creek Trail Replacement at Sheridan Blvd 100pcent
 2014-0494-01_1st_Bear Creek Trail Replacement at Sheridan Blvd 60 percent
 2014-0486-08_1st INTERSECTION SAFETY PROJECT_2014_Morrison and Perry Signal_Urgent Final
 2014-0486-07_1st INTERSECTION SAFETY PROJECT 2014 30th and Downing Urgent Final
 2014-0486-05_1st INTERSECTION SAFETY PROJECT 2014 30th and Pecos Urgent Final
 2014-0486-04_1st Intersection Safety Project 13th and Holly 112 E 45th Final Plan
 2014-0486-03_2nd INTERSECTION SAFETY PROJECT 2014 Cherry Creek and Kentucky Ave 100 percent
 2014-0486-03_1st INTERSECTION SAFETY PROJECT 2014 Cherry Creek S Dr and Kentucky Ave
 2014-0482-01_3rd_NB University over Cherry Crk Bridge Rehab D-01-cc-281 100 Percent
 2014-0482-01_2nd_NB University over Cherry Crk Bridge Rehab D-01-CC-281 95prct
 2014-0480-01_1st 18th St two way conversion Wynkoop to Blake 60percent
 2014-0433-01_4th_General Storm 100 Percent
 2014-0083-01_2nd_CDOT 19671-SH121 Wadsworth from Park Hill to Dartmouth
 2014-0083-01_1ST_CDOT 19671 - SH121 Wadsworth from Park Hill to Dartmouth
 2014-0080-01_1st_City Park Museum Road Phase 3C
 2014-0079-01_3rd_Cherry Creek South Drive Phase 3-Steele to Garfield 100percent
 2014-0079-01_2nd_Cherry Creek South Drive Phase 3-Steele to Garfield 60percent
 2014-0079-01_1st_Cherry Creek South Drive Phase 3-Steel to Garfield
 2014-0078-03 Easement Relinquishment at 4200 W Conejos Ave
 2014-0067-01_5th Stapleton Northfield Campus 100pcnt
 2014-0067-01_4th Stapleton Northfield Campus 100pcnt
 2014-0065-01_2nd_BNSF Bridge 540.09 over South Platte River Replacement 100 Percent
 2014-0061-04 Vacation at 55 S Zuni St
 2014-0051-19_Dedication W. Floyd Ave and S. Ingalls
 2014-0051-17 Dedication Public Alley between 25th 26th and Irving Julian
 2014-0038-05 Easement Relinquishment Two near 6950 E Chenango Ave
 2014-0019-06_Teleport RMWT 56th and Buckley
 2014-0019-03_Teleport RMWT 2242 Stout
 2014-0002-18 Xcel UC Synergetic Mississippi and Broadway
 2014-0001-47 CenturyLink USIC 2804 Niagra St
 2014-0001-45 CenturyLink USIC W. 10th Ave and Stuart St
 2014-0001-44 CenturyLink USIC 2081 Ivanhoe
 2014-0001-33 CenturyLink USIC 2807 Jasmine
 2013-0607-01_3rd_Triangle Park Improvements 100 Percent
 2013-0607-01_2nd_Triangle Park Improvements 95percent
 2013-0604-01_3rd Denver Water Vault Modifications 95 Percent
 2013-0604-01_2nd Denver Water Vault Modifications_60pcent
 2013-0603-06 Jefferson Park Apartments Tier II 27th and Decatur
 2013-0585-02 Easement Relinquishment at 3124 W 20th Ave
 2013-0577-02 Vacation at 3600 E Alameda
 2013-0548-02 Easement Relinquishment W 28th Ave and Vallejo St
 2013-0514-04 Easement Relinquishment 4880 Federal
 2013-0462-02 Vacation at 195 S Monaco
 2013-0447-01_3rd CDOT US-40 Colfax Clarkson-Colorado 95pcnt
 2013-0447-01_2nd CDOT US-40 Clarkson-Colorado 95percent
 2013-0433-01_5th 2014 General Strom 100 Percent
 2013-0433-01_4th 2014 General Storm 100 Percent
 2013-0388-01_2nd_Overhead Sign Bridge Project Phase IIIA_CPEP_95pcent
 2013-0385-01_3rd_Mill Levy Package 4 95percent
 2013-0373-01_2nd First Creek Restoration - Tower Rd to Pena Blvd 95 percent
 2013-0373-01_1st First Creek Restoration - Tower Rd to Pena Blvd 30 percent
 2013-0364-01_3rd Denver Water 15143A - Conduit No. 74 Relocation 100percent
 2013-0351-01_2nd City Park Pavilion Parking Lot Renovation 100 percent
 2013-0226-13_5th_Stapleton Filing 45-P-10 100pcent
 2013-0226-13_4th_Stapleton Filing 45-P-10 100 Percent
 2013-0144-02_3rd 38th and Blake Station TOD Bridge 100percent
 2013-0144-02_2nd 38th and Blake Station TOD Bridge 95pcent
 2013-0122-02 Easement Relinquishment at 2980 Huron St
 2013-0044-03_1st Platte River Improvements Schedule C Pasquinels Landing Park 100pcnt
 2013-0044-02_1st Platte River Improvements Grant-Frontier to Alameda Sched B 100 Percent
 2013-0044-01_6th_Drainage Report_Platte River Improvements Grant Frontier to Alameda Final
 2013-0044-01_5th Platte River Improvements Grant Frontier to Alameda Final
 2012-0515-04 Vacation at Yale Station
 2012-0425-01_3rd_Denver Water C14421A 2013 Pipe Rehabilitation Project_95 Percent
 2012-0413-05 Easement Relinquishment at Boulevard One
 2012-0381-02_1st_Platte Farm Open Space
 2012-0350-01_1st Vacation 740-744 Hazel Ct
 2012-0214-01_6th 33rd Street Outfall -31st and 36th Outfall project 100 Percent
 2012-0214-01_5th 33rd Street Outfall -31st and 36th Outfall project 95 Percent
 2012-0030-04_4th_ CDOT US 6 Bridges -Civil 90 Percent Drainage and Stuctures 100 Percent
 2012-0030-03_9th_Parks CDOT 18838 - Phase III Plate River Trail 60percent
 2012-0030-03_6th_Parks CDOT 18838 Phase II US Bridges Project
 2012-0024-01_3rd_Parks Revised Construction Specifications 95 percent
 2011-0622-01_5th_RTD Downtown Denver Circulator 60 Percent
 2011-0571-03_4th Dakota Outfall Phase 2 final 100percent
 2011-0489-02_5th 16th St Mall Reconstruction 100pcnt
 2011-0489-02_4th 16th St Mall Reconstruction 90pcnt
 2011-0489-02_3rd 16th St Mall Reconstruction 60pcent
 2011-0477-03 MEP 1500 Wewatta
 2011-0426-01_6th Hampden Heights Storm Sewer Phase III-Urgent Const
 2011-0426-01_5th Hampden Heights Storm Sewer Phase III-100 percent
 2011-0392-02_2nd MEP Amendment 999 S Broadway
 2011-0392-02_1st MEP Amendment 999 S Broadway
 2010-0448-01_3rd South Forest St Outfall 2nd 95percent
 2010-0446-06_1st Cherry Creek St and Drainage Improvements Drainage Report 95pcnt
 2010-0446-04_2nd_North University Outfall CNN Phase II 100 Percent
 2010-0446-04_1st_North University Outfall CCN - Phase II -5 Percent
 2010-0289-02_2nd Colfax Lighting Phase II Grant to Josephine Final 100pcnt
 2010-0289-02_1st Colfax Lighting Phase II Grant to Josephine 100pcnt
 2010-0217-03_Dedication Quincy and Pierce
 2009-0617-01_20th Denver Bike Sharing
 2009-0424-02 Vacation at Lakewood Gulch Park
 2009-0066-09_1st_I-25 Santa Fe Interchange Water Quality and DrainageFinal Reports
 2009-0066-08_3rd I-25 and Santa Fe Construction Bid Plans and Specs 100 Percent
 2009-0066-08_2nd_-25 Santa Fe Drive Construction Bid Plans and Specs 100 Percent
 2007-0522-05_1st DUS-North Metro Rail Line Area A-C Wet Utilities 60pcnt
 2007-0522-04_1st DUS-North Metro Rail Line South Platte River Bridge CLOMR 60pcnt
 2007-0522-03_1st DUS-North Metro Rail Line Area A through C Bridge Structures 60pcnt
 2007-0522-02_3rd DUS-North Metro Rail Line Area A through C 90percent
 2007-0522-02_2nd DUS-North Metro Rail Line Area A through C 60percent
 2007-0522-02_1st- DUS-North Metro Rail Line Tie In

Feedback