Summary of Remedial Action
2007 Denver Radium Streets Project
9th Avenue
Daily Project Activities:
|
Date
|
Project Activity
|
5/7/07
|
Traffic Control & Barricades setup; no construction activities scheduled
|
5/8/07
|
Pre-construction site meeting; no construction activities scheduled
|
5/9/07
|
Conduct daily health and safety meeting; Tree trimmer removed low branches; Removed, loaded trucks, and hauled contaminated asphalt to waste facility (3 loads)
|
5/10/07
|
Conduct daily health and safety meeting; Tree trimmer removed low branches; Removed, loaded trucks, and hauled contaminated asphalt to waste facility (6 loads)
|
5/11/07
|
Conduct daily health and safety meeting; Tree trimmer removed low branches; Removed, loaded trucks, and hauled contaminated asphalt to waste facility (6 loads)
|
Photo Log:
Tree Trimmer removing low branches
Contaminated asphalt being removed and loaded into lined trucks
Contaminated asphalt being removed; dust suppression occurring