COMMERCIAL CONSTRUCTION PROJECTS:
Building
All other required inspections are not completed prior to final building inspection. (frame/final)
Fire walls installed incorrectly/screw spacing/sealing of fire joints (frame/fire wall inspection/final)
Drafts stops not installed or sealed properly (frame/final)
Fire sealing of all penetrations in a rated assembly not complete (frame/final)
Post permanent address/unit number (final)
Self closing devices on fire rated doors do not operate properly (final)
Guardrails/handrails do not meet code requirements/height/rise/run (final)
Plumbing
Foundations not backfilled (under slab)
Undersize vent lines (under slab/rough)
Lack of water/pressure test of piping (under slab/rough)
Missing or incorrect location of sprinkler heads (rough/final)
Sprinkler heads painted or protection tape not removed (final)
Electrical
Rough – In Inspection
At the time you call for your rough – in inspection, you should have all your wire pulled, stapled properly, and all splices made up and ready to except devices and fixtures. Do not install devices or fixtures or cover any wiring with insulation, wall covering, drywall or paneling. All wire splices and equipment grounding conductor make-up shall be completed prior to the rough inspection.
Final Inspection
The Electrical installation should be complete at the time of the request. All devices and fixtures installed service equipment complete and labeled properly. All wiring shall be free from short circuits, ground faults and open circuits. All light fixtures, switches and receptacles are required to be grounded.
Problems to avoid
Improper system grounding connections (rough/final)
The bonding of metal water piping in the vicinity of separately derived systems. (rough/final)
The improper installation and securing of expansion fittings
Use of electrical equipment without following the manufacturer’s instructions (rough/final)
The non-bonding of service raceways and equipment (rough/final)
Mechanical
Use of ventless gas appliances (not allowed)
Fire smoke dampers not properly supported or framed (rough)
Condensate drains not properly installed (rough)
Duct work not properly fastened (rough/final)
RESIDENTIAL CONSTRUCTION PROJECTS:
Building
Footing lacking proper depth or width
Set back encroachment (footing/slab)
Exterior sheathing not nailed properly (frame)
Straps or tie downs missing (frame)
Smoke detector location incorrect (frame/final)
Fireplace flue clearance to combustibles
Minimum opening size for fire rescue not achieved (frame)
Plumbing
Water/air test on piping not performed or approved (under slab)
Undersized vents (under slab/rough)
Water heater, improperly installed or functioning temperature and pressure relief valve (rough/final)
Water heater, improper termination of discharge pipe (rough/final)
No access to tub motor on jetted tubs (final)
Water heater not vented properly (rough/final)
Electrical
Protect wiring from nails and screws, no nail plates (rough)
Overcrowded switch box (rough)
Smoke detector to close to HVAC return/supply (rough/final)
Too many wires through a hole in frame (rough)
Mechanical
Bathroom, clothes dryer or kitchen hood vents not installed properly (rough)
Installation of ventless gas appliances (not allowed)
Setback encroachment of air conditioning unit (rough/final)
New gas fired appliance venting into unlined existing chimney chase (rough/final)